24-0大图-国防部集成产品保障实施路线图(1页)DoD Integrated Product Support Implementation Roadmap

ID:25632

大小:0.45 MB

页数:1页

时间:2022-12-01

金币:15

上传者:战必胜
DoD Integrated Product Support Implementation Roadmap
Materiel Solution Analysis Technology Development Engineering and Manufacturing Development Production and Deployment Operations and Support
Major Program Key
Events/Products
ICD
POM Input
TES
ICE
AoA
RFP
Milestone
Documentation
Spectrum
Certication
Compliance
CARD
ADM
DAB Review
SEP
CONOPS
ACAT Designation
TDS (input to the
RFP)
Exit Criteria
CCA Compliance
Acquisition Plan
Economic Analysis
Component Cost
Estimate (CCE)
Draft CDD
SEP
Milestone
Documentation
Acquisition Plan
CORE
Acquisition Strategy
(input to the RFP)
LCC
TEMP
CCA Compliance
LCSP
APB
ADM
RFP
Post-CDR/PDR
Report
CCE
Allocated Systems
Baseline
AoA
DAB Review
DT&E Report
Corrosion
Prevention Control
Plan
EVMS
LA
Independent TRA/
TRA
Independent Review
and Assessment
CCDR
PESHE/NEPA
Exit Criteria
Spectrum
Supportability
Determination
PPP
Spectrum
Certication
Compliance
Service Cost
Position (SCP)
ACAT Designation
BCA
ADM
Acquisition Plan
CCA Compliance
CCE
CCDR
CORE
AoA
LRIP Source
Selection
Initial Product
Baseline
Spectrum
Supportability
Determination
Corrosion
Prevention Control
Plan
Independent TRA/
TRA
Spectrum
Certication
Compliance
LCC Estimate
CPD
Acquisition Strategy
BCA
ISP
Milestone
Documentation
SEP
APB
TEMP
EVMS
ICE
CARD
LCSP
LA
DT&E Report
PPP
PESHE/NEPA
Exit Criteria
DAB Review
LRIP Contract RFP for Production
Contract
DAB Review Final Production
Baseline
CPD
APB
Acquisition Strategy
Major Modications/
System
Improvements
CCE
System Fielding
(H/W/S)
TEMP
New DOTMLPF
Change
Recommendation
(DCR)
CCDR
FRP Contract
Beyond LRIP Report
PPP
CARD
Acquisition Plan
AoA
Exit Criteria
LCSP
ADM
Component LFT&E
Report
LA
EVMS
CCA Compliance
DT&E Report
IOT&E Completed
SCP
ICE
Logistics /
Program /
Technical
Reviews
ITR ASR DAB IBR
SRR
SFR
TRA
PDR
LA
DAB IBR
PDR
CDR
TRR
TRA
LA
DAB SVR
FCA
PRR
AOTR
OTRR
PCA
LA
DAB
ISR
Activities Outputs Activities Outputs Activities Outputs Activities Outputs Activities Outputs
Product Support Management
Ensure Logistics trade studies/market research are incorporated
in AoA and forecast product support for each alternative
Identify Support and Maintenance Concepts and Technologies
Develop initial Product Support inputs to Life Cycle Sustainment
Plan (LCSP)
Recommend Product Support Requirements for inclusion in the
ICD
Evaluate New and Existing Product Support Capabilities
Identify Initial Sustainment Metrics
Identify supportability risks/cost drivers
Conduct supportability risk assessment/mitigation
Develop initial supportability WBS/IMS
Assess replaced system Product Support Package for
applicability to new capability
Develop Funding Requirements to Execute Product Support
Concept
Identify/Charter Product Support Team
Incorporate initial support test strategy into TES
IOT&E
Develop initial Product Support inputs to HSI plan
Identify product support requirements for inclusion in the RFP
Participate in source selection and evaluation
Support PM in preparation for Defense Acquisition Board (DAB)
Review
Initial Life Cycle Sustainment
Plan (LCSP)
Product Support Alternatives
(Included in AoA)
Initial Funding Requirements
for Product Support Concept
(ICE, LCCE, CARD)
Initial Product Support
Concept (Included in
Technology Development
Strategy/Acquisition Strategy)
Product Support IMS
Product Support Test
Strategy (Included in TES)
Product Support
Requirements (Included in
RFP)
Recommend Product Support
Requirements (included in
the ICD)
Sustainment Metrics
Product Support inputs to:
Technology
Development Strategy
(TDS)
Test and Evaluation
Strategy (TES)
SEP
RAM-C Report
PESHE
CORE (50/50)
SOR/DSOR
LCCE/CARD
HSI Plan
Milestone Decision - MS A
Update Life Cycle Sustainment Plan (LCSP) from Initial Support
Strategy
Update Supportability Risk Assessment and Identify Mitigation
Strategy
Inuence Design for Supportability through participation in
technical/program reviews
Develop Product Support Strategy
Develop Initial Disposal Strategy
Develop Fielding Strategy
Include CORE, 50/50, DSOR/SOR
Update Funding Requirements to Execute Product Support
Strategy
Collect and collate IPS elements Supportability Requirements in
support of RFP
Participation in source selection evaluation process
Update Inputs to HSI plan
Update Product Support Integrated Master Schedule (IMS)
Recommend Product Support Requirements for inclusion in the
CDD
Use TES to develop supportability events for TEMP
Update Product Support BCA
Support PM in preparation for Defense Acquisition Board (DAB)
Review
Life Cycle Sustainment Plan
(LCSP)
Product Support IMS
(Included in Program IMS)
Product Support Strategy
Logistics/Supportability
Portions of the: Performance
Spec, WBS and SOW/SOO
(Input to RFP)
Revised Funding
Requirements to Execute
Product Support Strategy
(Included in the updated
LCCE/POM)
Supportability Testing Events
(Included in the TEMP)
Product Support
Requirements (Included in
the CDD)
Initial Disposal Strategy
Fielding Strategy
Product Support inputs to:
Acquisition Strategy
TEMP
SEP
RAM-C Report
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
LCCE/CARD
Initial FMECA
RFP
HSI Plan
Milestone Decision - MS B
Ensure Participation in Logistics/Technical/Program Reviews
Collect and collate IPS elements Supportability Requirements in
support of RFP
Participate in source selection process
Develop Life Cycle Sustainment Plan
Fielding/Deployment Plan, Disposal Plan, CORE, 50/50
Update Funding Requirements to Execute Life Cycle
Sustainment Plan
Incorporate supportability testing procedures in the TEMP to
include pass/fail criteria
Product Support Test Package for DT/OT and supportability
testing
Update Product Support BCA
Identify Product Support Integrator(s)
Update Inputs to HSI Plan
Update Life Cycle Sustainment Plan (LCSP)
Provide Product Support Requirements in the CPD
Support PM in preparation for Defense Acquisition Board (DAB)
Review
Life Cycle Sustainment Plan
(LCSP)
Draft Fielding/Deployment
Plan
Validated Product Support
Package
Supportability Requirements
(included in the CPD)
Revised Funding
Requirements to Execute
Product Support Strategy
(included in the updated
LCCE/POM)
Logistics/Supportability
Portions of the: Performance
Spec, WBS and SOW/SOO
(input to LRIP RFP)
Product Support
Requirements (included in
the CPD)
Product Support Integrator(s)
identied
Draft Disposal Plan
Product Support inputs to:
Acquisition Strategy
TEMP
SEP
RAM-C Report
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
LCCE/CARD
RFP
HSI Plan
Milestone Decision - MS C
Ensure Participation in Logistics/Program/Technical Reviews
Update Fielding Plan
Product Support Test Package for IOT&E and supportability
testing
Collect and collate IPS elements Supportability Requirements in
support of RFP
Participate in source selection process
Conduct Supportability Demonstration
Post Deployment Reviews
Update Life Cycle Sustainment Plan (LCSP)
Update Disposal Plan
Develop Performance Based Agreements with PSI
Update Inputs to HSI Plan
Update Funding Requirements to Execute Product Support
Strategy
Update Product Support BCA
Update Product Support IMS
Support PM in preparation for Defense Acquisition Board (DAB)
Review
Life Cycle Sustainment Plan
(LCSP)
DMSMS Plan (from Supply
Support, Sustaining
Engineering, Design
Interface, Maintenance
Planning and Management)
Technical Data Strategy
that addresses Technical
Manuals, Engineering,
Data, Bills of Materiel
(from Technical Data,
Sustaining Engineering,
Design Interface, Support
Equipment)
Training Program (from
Training and Training
Devices, Facilities and
Infrastructure, Maintenance
Planning and Management)
Depot Maintenance
Capability (Maintenance
Planning and Management,
Facilities and Infrastructure,
Product Support
Management)
PD Software Support
(Computer Resources)
Supportability FRP Source
Selection
Revised Funding
Requirements to Execute Life
Cycle Sustainment Plan
Validated Product Support
Package
Final Fielding Plan
Product Support Contracts
and Agreements
Product Support inputs to:
Acquisition Strategy
TEMP
SEP
RAM-C Report
CDD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
LCCE/CARD
RFP
HSI Plan
Milestone Decision Full -
Rate Production (FRP)
Execute System Fielding Plan
Execute Life-Cycle Sustainment Plan (LCSP)
Proactive System Performance Management
MTBF analysis
Causal factors analysis
Obsolescence Management
Sustaining Engineering
CBM+
RCM
COA Development/Implementation
System Performance Measurement (KPPs and KSA)
Update inputs to HSI plan
Update Product Support IMS
Update Product Support BCA
System Disposal - Update Plan
Warghter Received Total
System
Post Fielding Evaluation
System Modications (ECP)
System Improvements
New System Increment
Disposed Systems
Maintenance Planning and Management
Review ICD to identify maintenance requirements and support
KPPs and KSAs
Lead Development of Maintenance Strategy inputs to LCSP
Develop Maintenance Planning and Management requirements
for inclusion in RFP
Ensure design review requirements include supportability
Ensure technical reviews include an assessment of
supportability
Participate as a Maintenance Planning and Management SME
advisor to the source selection process
Develop the preliminary maintenance planning and
management IMS
Develop preliminary Maintenance Planning and Management
Concept
Conduct a maintenance AoA for each design alternative
Analyze new and historical technological solutions
Support PSM market research/trade studies activities
Develop Funding Requirements to Execute Maintenance
Planning Concept
Participate in initial use study
Prepare Initial input to RAM-C Rationale Report
Supportability requirements (MTBF, MTTR, A
O
, MLDT, etc.)
System support concept
Maintenance concept
Technology Development Strategy
Provide Maintenance Planning inputs to the Product Support
BCA
Develop Initial Maintenance concept inputs to HSI plan
Maintenance Planning and
Management Concept
Maintenance Planning and
Management IMS
Maintenance Planning inputs
to:
LCSP
CARD/LCCE/ICE
RFP
TES
TDS
ICD
Product Support BCA
RAM-C Report
HSI Report
Review CDD to identify maintenance concepts
Support planning for and conduct of system level analyses
Tradeoff analysis
Functional analysis to identify operation and maintenance
functions
Develop initial Maintenance Strategy
Research DSOR/SOR impacts
Research CORE (50/50) impacts
Conduct supportability analysis to inuence design
Complete 1st iteration of the RCM Analysis
Update RAM-C Rationale Report
Update the maintenance planning and management IMS
Lead development of Maintenance Planning and Management
inputs for the LCSP
Participate in technical and programmatic reviews
Update maintenance planning and management requirements
for inclusion in RFP
Provide Maintenance Planning and Management inputs to
Product Support BCA update
Analyze System Use Study/Mission Prole/CONOPS Summary
to extract:
Design reference mission prole
Functional proles
Logistics use proles
Design for testing (BIT)
Standardization and Interoperability
Maintenance Strategy
Maintenance Planning inputs
to:
LCSP
Acquisition Strategy
TEMP
SEP
RAM-C Report
CDD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
LCCE/CARD
Initial FMECA
RFP
HSI Plan
Develop Maintenance Plan
Update system supportability analysis
Review updated use study
Lead Maintenance Task Analysis review with IPSE SMEs
Preventive and corrective maintenance tasks identied
using RCM and CBM+
Review FMECA and LORA data to support maintenance
planning decisions
Provide Maintenance Planning and Management inputs to
Product Support BCA update
Update maintenance planning and management requirements
for inclusion in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update HSI Plan
Update the maintenance planning and management IMS
Update maintenance planning and management information in
LCSP
Participate in technical and programmatic reviews
Maintenance Plan
Updated system
supportability analysis
Maintenance Planning inputs
to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update maintenance planning and management requirements
for inclusion in RFP
Participate as a SME advisor to the source selection process
Update Maintenance Plan
Update inputs to the LCCE Funding Statement
Update the maintenance planning and management IMS
Update maintenance planning and management inputs to the
LCSP
Participate in technical and programmatic reviews
Provide support to Product Support BCA
Updated Maintenance Plan
Updated system
supportability analysis
Maintenance Planning inputs
to:
HSI Plan
Acquisition Strategy
SEP
IMS
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
LCSP
LCCE/CARD
Product Support BCA
Execute Maintenance Plan
Update inputs to the LCCE
Update the maintenance planning and management IMS
Update maintenance planning inputs to the LCSP
Proactive System Performance Management
Updated system
supportability analysis
Maintenance Planning inputs
to LCSP
Prognostics and Health
Management
QDR
ECP/ECR
Corrosion Control
Design Interface
Ensure membership of appropriate IPTs (SE, Test, Product
Support, etc)
Develop the preliminary design interface IMS
Participate in the Alternative Systems Review (ASR)
Conduct AoA
Participate in initial Use Study
Identify product support user needs
Explore functional requirements
Review ICD to identify design interface requirements and
support KPPs and KSAs
Develop initial design interface inputs to LCSP
Develop design interface requirements for inclusion in RFP
Ensure design review requirements include supportability
Ensure technical reviews include an assessment of
supportability
Participate as a Design Interface SME advisor to the source
selection process
Develop preliminary design interface concept
Explore life-cycle product support capabilities
Conduct a maintenance AoA for each design alternative
Analyze new and historical technological solutions
Support PSM market research/trade studies activities
Develop Funding Requirements to Execute design interface
Concept
Prepare Initial input to RAM-C Rationale Report
Supportability requirements (MTBF, MTTR, A
O
, MLDT, etc.)
System support concept
Maintenance concept
Technology Development Strategy
Provide design interface inputs to the Product Support BCA
Develop Initial design interface concept inputs to HSI plan
Initial functional analysis cost
estimates
Preliminary design interface
concept
Product support alternatives
RAM-C Report
Inputs to the LCSP
Design Interface inputs to:
CARD/LCCE/ICE
RFP
TES
TDS
ICD
Product Support BCA
HSI Report
Review CDD to identify design interface concepts
Update design interface requirements for inclusion in RFP
Participate as SME advisor to the source selection process
Update the design interface IMS
Evaluate product support metrics
Develop Design Interface inputs to LCSP
Inputs to DMSMS Plan
Support planning for and conduct of system level analyses
Tradeoff analysis
Functional analysis to identify operation and maintenance
functions
Develop initial design interface strategy
Research DSOR/SOR impacts
Research CORE (50/50) impacts
Conduct supportability analysis to inuence design
Complete 1st iteration of the RCM Analysis
Update RAM-C Rationale Report
Participate in technical and programmatic reviews
Provide design interface support to Product Support BCA update
Analyze System Use Study/Mission Prole/CONOPS Summary
to extract:
Design reference mission prole
Functional proles
Logistics use proles
Design for testing (BIT)
Standardization and Interoperability
Updated functional analysis
cost estimates
Design interface strategy
Initial FMECA
Design interface inputs to:
LCSP
Acquisition Strategy
TEMP
SEP
RAM-C Report
CDD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
LCCE/CARD
RFP
HSI Plan
Participate and provide input to the generation of CPD in
support of PSM
Update design interface requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the design interface IMS
Perform an updated RCM Analysis
Update Design Interface inputs to LCSP
Participate in the SE led development of the Reliability Growth
Plan
Monitor and assess OEM submitted waivers and deviations for
Participate in technical and programmatic reviews
Contribute to the generation of Detailed Test Plans
Parts and materiel selection
RAM and Quality MOEs
Design limit testing
Manufacturing plan screening
HMC&M/ESOH Compliance Plan
Provide updates to PSM risk assessment
Update inputs to SEP
Update inputs to DMSMS Plan
Update system supportability analysis
Provide Design Interface inputs to Product Support BCA update
Update HSI Plan
Establish Conguration Management Plan
Update functional analysis
cost estimates
Updated FMECA
Updated Maintenance Task
Analysis
Updated design interface
strategy
Design Interface Plan
Updated system
supportability analysis
Design Interface inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Conguration Baseline
Update design interface requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the design interface IMS
Provide input to PSM risk assessment
Update design interface chapter of LCSP
Provide input to requirements documents for future increments
and capabilities
Participate in technical and programmatic reviews
Participate in TRRs and PCAs
Contribute to the generation of Detailed Test Plans
Ensure that Maintenance concerns are assessed during
OT/OA/FUE
Ensure Supportability concerns are assessed during OT/
OA/FUE
Provide input to pass/fail criteria for supportability test
events
Provide support to Product Support BCA
Update CM Plan
Updates to RAM-C Report
Identied Risks
Updated Design Interface
Plan
Updated system
supportability analysis
Design Interface inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Responsibility for supportability engineering (e.g.,
conguration management, reliability, ECP/ECR) at
this stage of the program’s lifecycle transitions to the
Sustaining Engineering IPS Element.
Sustaining
Engineering
Responsibility for supportability (e.g., conguration
management, reliability, ECP/ECR) at this stage of the
program’s lifecycle is Design Interface IPS Element.
Responsibility for supportability (e.g., conguration
management, reliability, ECP/ECR) at this stage of the
program’s lifecycle is Design Interface IPS Element.
Responsibility for supportability (e.g., conguration
management, reliability, ECP/ECR) at this stage of the
program’s lifecycle is Design Interface IPS Element.
Responsibility for supportability (e.g., conguration
management, reliability, ECP/ECR) at this stage of the
program’s lifecycle is Design Interface IPS Element.
Update inputs to the LCCE
Update the Sustaining Engineering IMS
Update Sustaining Engineering in LCSP
Execute Sustaining Engineering plan
Proactive System Performance Management
Most recent update to RCM
Analysis
Supportability testing
information (plans, metrics,
results)
Prognostics and Health
Management
QDR
ECP/ECR
Corrosion Control
Supply Support
Participate as a SME advisor to the source selection process
Develop the preliminary Supply Support IMS
Review ICD to identify supply support requirements and support
KPPs and KSAs
Develop initial supply support inputs to LCSP
Develop supply support requirements for inclusion in RFP
Ensure design review requirements include supportability
Ensure technical reviews include an assessment of
supportability
Develop preliminary Supply Support concept
Analyze new and historical technological solutions
Support PSM market research/trade studies activities
Develop Funding Requirements to Execute Supply Support
Concept
Participate in initial use study
Prepare Initial input to RAM-C Rationale Report
Supportability requirements (MTBF, MTTR, A
O
, MLDT, etc.)
System support concept
Maintenance concept
Technology Development Strategy
Provide Supply Support inputs to the Product Support BCA
Develop Initial Supply Support concept inputs to HSI plan
Supply Support alternatives
Risks and cost drivers for
supportability
Supply Support IMS
Supply Support inputs to:
LCSP
CARD/LCCE/ICE
RFP
TES
TDS
ICD
Product Support BCA
RAM-C Report
HSI Report
Prepare SOW/SOO with appropriate DIDS/CDRLS for inclusion
in RFP
Participate as a SME advisor to the source selection process
Update the supply support IMS
Develop Supportability WBS
Select preferred Supply Support strategy
Draft DMSMS Management Plan
Develop Supply Support inputs to the LCSP
Participate in technical and programmatic reviews
Identify and analyze Supply Support alternatives, risk and cost
drivers
Develop Draft Disposal Plan
Review CDD to identify supply support concepts
Support planning for and conduct of system level analyses
Tradeoff analysis
Functional analysis to identify operation and maintenance
functions
Conduct supportability analysis to inuence design
Complete 1st iteration of the RCM Analysis
Update RAM-C Rationale Report
Provide support to Supply Support BCA update
Analyze System Use Study/Mission Prole/CONOPS Summary
to extract:
Design reference mission prole
Functional proles
Logistics use proles
Design for testing (BIT)
Standardization and Interoperability
Supply Support Strategy
Supply Support inputs to:
LCSP
Acquisition Strategy
TEMP
SEP
RAM-C Report
CDD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
LCCE/CARD
Initial FMECA
RFP
HSI Plan
Prepare SOW/SOO with appropriate DIDS/CDRLS for inclusion
of production contract
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the Supply Support IMS
Participate in technical and programmatic reviews
Update Supply Support Plan
Conduct provisioning planning conference
Review Capabilities Development Document and Rene Supply
Support
Provide Supply Support inputs to validation of product support
package
Draft Fielding Plan
Use LORA to determine impacts on Supply Support strategy
Update system supportability analysis
Review updated use study
Provide Supply Support inputs to Product Support BCA update
Update HSI Plan
Update Supply Support requirements for inclusion in RFP
Update Supply Support of LCSP
Supply Support inputs to
functional/allocated baselines
Supply Support Plan
Updated system
supportability analysis
Supply Support inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update Supply Support requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the Supply Support IMS
Update Supply Support inputs to the LCSP
Participate in technical and programmatic reviews
Submit DD-61 Request for Nomenclature
Update Supply Support Plan
Provide support to Product Support BCA
Updated Supply Support Plan
Supply Support inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update inputs to the LCCE
Update the Supply Support IMS
Update Supply Support inputs to the LCSP
Execute Supply Support plan
Proactive System Performance Management
Supply Support inputs to
LCSP
Prognostics and Health
Management
QDR
ECP/ECR
Corrosion Control
Training and Training Support
Review ICD to identify Training and Training Support
requirements and support KPPs and KSAs
Initiate Training Systems Requirements Analysis (TSRA)
Training Situation Analysis (TSA)
Participate as a SME advisor to the source selection process
Develop the preliminary training IMS
Develop initial training inputs to LCSP
Identify training requirements for inclusion in RFP
Ensure design review requirements include supportability
Ensure technical reviews include an assessment of
supportability
Develop preliminary training concept
Analyze new and historical technological solutions
Support PSM market research/trade studies activities/AoA
Develop Funding Requirements to Execute training Concept
Participate in initial use study
Prepare Initial input to RAM-C Rationale Report
Supportability requirements (MTBF, MTTR, A
O
, MLDT, etc.)
System support concept
Maintenance concept
Technology Development Strategy
Provide Training inputs to the Product Support BCA
Develop Initial training concept inputs to HSI plan
Inputs to initial system
training plan
Training Concept
Manpower Estimate Report
(MER)
Training and Management
IMS
Training inputs to:
LCSP
CARD/LCCE/ICE
RFP
TES
TDS
ICD
Product Support BCA
RAM-C Report
HSI Report
Training System Alternatives
Report (TSAR)
Training System Functional
Description (TSFD)
Update Training Systems Requirements Analysis (TSRA);
Training Situation Analysis (TSA); Training Situation Analysis
Report (TSAR); Training Device Requirements Document
(TDRD); TSFD
Update Training Systems Plan (TSP)
Develop Curriculum for Test Training
Train Individuals
Update training requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update the training IMS
Develop training inputs to the LCSP
Participate in technical and programmatic reviews
Review CDD to identify training concepts
Support planning for and conduct of system level analyses
Tradeoff analysis
Functional analysis to identify operation and maintenance
functions
Develop initial training strategy
Research DSOR/SOR impacts
Research CORE (50/50) impacts
Conduct supportability analysis to inuence design
Complete 1st iteration of the RCM Analysis
Update RAM-C Rationale Report
Provide Training and Training Support inputs to Product Support
BCA update
Analyze System Use Study/Mission Prole/CONOPS Summary
to extract:
Design reference mission prole
Functional proles
Logistics use proles
Design for testing (BIT)
Standardization and Interoperability
Training strategy inputs to
Capability Development
Document (CDD)
Training strategy inputs to
Product Support BCA
Updated MER
Updates to training IMS
Training Strategy
Training inputs to:
LCSP
Acquisition Strategy
TEMP
SEP
RAM-C Report
PESHE
CORE (50/50)
SOR/DSOR
LCCE/CARD
Initial FMECA
RFP
HSI Plan
Update TSRA; TSA; TSAR; TDRD; TSFD
Update Training Systems Plan
Training for Test and Evaluation
Validate Training Systems
Procurement of Training Devices
Develop Operators and Maintainers Training
Update training requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the training IMS
Develop training plan
Updates training inputs to the LCSP
Participate in technical and programmatic reviews
Review updated use study
Provide Training and Training Support inputs to Product Support
BCA update
Update HSI Plan
Training plan inputs to
Manpower Estimate (Review)
Operational Test Agency
Report of DT&E Results (to
include training results)
Training System Plan
Updated system
supportability analysis
Training inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update TSRA; TSA; TSAR; TDRD; TSFD
Update Training Systems Plan
Develop Operational Test Training
Update Operators and Maintainers Training
Initial Training for Fleet
Training equipment delivered and installed
Update training requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the training IMS
Update training plan
Update training inputs to the LCSP
Participate in technical and programmatic reviews
Provide support to Product Support BCA
Updates to new equipment
training
Training System Plan
Curriculum/program
of instruction (POI) for
schoolhouse
Training inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Delivery of Curriculum for schoolhouse
Training Course Conduct Package
Training Project Plan
Course Training Task List
Training Course Control Document
Curriculum Outline of Instruction
Lesson Plan
Trainee Guide
Test Package
Instructional Media Package
Instructional Performance Requirements Document
Execute Training plan
Update inputs to the LCCE
Update the Training IMS
Update Training inputs to the LCSP
Curriculum/POI
Equipment sustainment
training package
Training inputs to LCSP
Manpower and Personnel
Review ICD to identify Manpower and Personnel requirements
and support KPPs and KSAs
Develop initial Manpower and Personnel inputs to LCSP
Develop Manpower and Personnel requirements for inclusion
in RFP
Ensure design review requirements include supportability
Ensure technical reviews include an assessment of
supportability
Participate as a Manpower and Personnel SME advisor to the
source selection process
Develop the preliminary Manpower and Personnel IMS
Develop Preliminary Manpower and Personnel concept in
support of initial support strategy
Identify Preliminary Manpower Estimate Report (MER)
Inputs to M&P Concepts of Employment
Identify M&P Risks, Cost Drivers, and Mitigation Plans
Develop Funding Requirements to Execute Manpower and
Personnel Concept
Participate in initial use study
Prepare Initial input to RAM-C Rationale Report
Supportability requirements (MTBF, MTTR, A
O
, MLDT, etc.)
System support concept
Maintenance concept
Technology Development Strategy
Provide Manpower and Personnel inputs to the Product Support
BCA
Develop Manpower and Personnel concept inputs to HSI plan
Inputs to initial system
training plan
Preliminary Manpower
Estimate Report (MER)
Manpower Concept
Manpower and Personnel
IMS
Manpower and Personnel
inputs to:
LCSP
CARD/LCCE/ICE
RFP
TES
TDS
ICD
Product Support BCA
RAM-C Report
HSI Report
Update Initial Manpower Estimate Report
Update M&P Concepts of Employment
Update M&P Risks, Cost Drivers, and Mitigation Plans
Update M&P requirements to support maintenance concepts,
technologies and RFP
Participate as a SME advisor to the source selection process
Participate in technical and programmatic reviews
Develop M&P inputs to the LCSP
Review CDD to identify M&P concepts
Support planning for and conduct of system level analyses
Tradeoff analysis
Functional analysis to identify operation and maintenance
functions
Develop initial M&P Strategy
Research DSOR/SOR impacts
Research CORE (50/50) impacts
Conduct supportability analysis to inuence design
Complete 1st iteration of the RCM Analysis
Update RAM-C Rationale Report
Update the M&P IMS
Provide support to M&P BCA update
Inputs to initial system
training plan
Preliminary Manpower
Estimate (MER)
Manpower and Personnel
Strategy
Manpower and Personnel
inputs to:
LCSP
Acquisition Strategy
TEMP
SEP
RAM-C Report
CDD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
LCCE/CARD
Initial FMECA
RFP
HSI Plan
Update Manpower and Personnel inputs for the LCSP
Update Manpower Estimate Report
Inputs to M&P Concepts of Employment
Identify M&P Risks, Cost Drivers, and Mitigation Plans
Create Manning Billets (military/civilian)
Update M&P IMS
Develop Manpower and Personnel Plan
Update system supportability analysis
Review updated use study
Lead Maintenance Task Analysis review with IPSE SMEs
Preventive and corrective maintenance tasks identied
using RCM and CBM+
Review FMECA and LORA data to support maintenance
planning decisions
Provide Manpower and Personnel inputs to Product Support
BCA update
Update Manpower and Personnel requirements for inclusion in
RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update HSI Plan
Participate in technical and programmatic reviews
Component Manning
Document
Manpower and Personnel
Plan
Updated system
supportability analysis
Manpower and Personnel
inputs to:
• LCSP
Acquisition Strategy
• SEP
• TEMP
• CPD
• PESHE
• CORE (50/50)
• SOR/DSOR
• Product Support BCA
• IMS
• LCCE/CARD
• HSI Plan
Update Manpower and Personnel Plan
Update Manpower Estimate Report
Identify M&P Risks, Cost Drivers, and Mitigation Plans
Create Manning Billets (military/civilian)
Update M&P inputs to the LCSP
Update Manpower and Personnel requirements for inclusion in
RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE Funding Statement
Update the Manpower and Personnel IMS
Participate in technical and programmatic reviews
Provide support to Product Support BCA
Update System Training Plan (STP)
Updated Manpower Estimate
Updated System Training
Plan (STP)
Updated Manpower and
Personnel Plan
Manpower and Personnel
inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update MER
Analyze, track, monitor in accordance with LCSP
Execute M&P (lling billet for organic or contractor support
personnel)
Fill CIV/MIL billets
Update inputs to the LCCE
Update the M&P IMS
Execute Manpower and Personnel Plan
Inputs to major system
modications to address
manpower and personnel
impacts related to ECP,
changes to CONOPs,
technical insertion and/or
similar changes.
Manpower and Personnel
inputs to LCSP
Technical Data
Participate as a SME advisor to the source selection process
Develop initial Technical Data Strategy and inputs to LCSP
Review ICD to identify Technical Data requirements and support
KPPs and KSAs
Develop Technical Data requirements for inclusion in RFP
Ensure design review requirements include supportability
Ensure technical reviews include an assessment of
supportability
Develop the preliminary Technical Data IMS
Identify Technical Data Concept
Support PSM market research/trade studies activities
Develop strategy for disposal/archiving of technical data
Develop Funding Requirements to Execute Technical Data
Concept
Participate in initial use study
Prepare Initial input to RAM-C Rationale Report
Supportability requirements (MTBF, MTTR, A
O
, MLDT, etc.)
System support concept
Maintenance concept
Technology Development Strategy
Provide Technical Data inputs to the Product Support BCA
Develop Initial Technical Data inputs to HSI plan
Acquisition Information
Assurance Strategy (input
to AoA)
Consideration of technical
issues
Technical Data Strategy
(input to LCSP)
Technical data disposal
strategy (part of TDRS input
to LCSP)
Technical Data Concept
Technical Data IMS
Technical Data inputs to:
CARD/LCCE/ICE
RFP
TES
TDS
ICD
Product Support BCA
RAM-C Report
HSI Report
Update Technical Data requirements/Technical Data
management strategy
Input Technical Data requirements into RFP
Dene Technical Data Package design
Update Technical Manual Contract Requirements (TMCR)
Provide support to Product Support BCA update
Provide inputs to the product support IMS
Participate as a SME advisor to the source selection process
Update Technical Data inputs to LCSP
Participate in technical and programmatic reviews
Review CDD to identify maintenance concepts
Support planning for and conduct of system level analyses
Tradeoff analysis
Functional analysis to identify operation and maintenance
functions
Research DSOR/SOR impacts
Research CORE (50/50) impacts
Conduct supportability analysis to inuence design
Complete 1st iteration of the RCM Analysis
Update RAM-C Rationale Report
Analyze System Use Study/Mission Prole/CONOPS Summary
to extract:
Design reference mission prole
Functional proles
Logistics use proles
Design for testing (BIT)
Standardization and Interoperability
Updated Technical Data
Requirements for inclusion
in RFP
Acquisition Information
Assurance Strategy (input
to AoA)
Inputs to the LCCE
Updated Technical Data
Strategy
Technical Data inputs to:
LCSP
Acquisition Strategy
TEMP
SEP
RAM-C Report
CDD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
CARD
Initial FMECA
HSI Plan
Ensure development of Technical Data for support package T&E
Validate/Verify Technical Data
Development Design
Review, accept and/or comment on technical data deliverables
(e.g., methods, descriptions, graphical representations) for
production and fabrication processes for:
Special Inspection Equipment
Special tooling
Special packaging instructions
Technical Data Strategy Updates (Data Rights/Data Access)
input to RFP
Participate in source selection process
Participate in programmatic and technical reviews
Update inputs to the LCCE to include special/unique support
requirements
Update the Technical Data IMS
Develop Draft Fielding Plan
Develop LRIP Requirements
Update Technical Data inputs to the LCSP
Load Publications/Manuals
Develop Technical Data Plan
Update system supportability analysis
Provide Technical Data inputs to Product Support BCA update
Update HSI Plan
Net-centric Data Strategy
(included in the Technical
Data Strategy)
Acquisition Information
Assurance Strategy (input
to AoA)
Technical Data Plan
Technical Data inputs to:
Program Protection Plan
FCA Report
Draft Fielding Plan
CDR Report
LRIP Requirements
(input to RFP)
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Validate/Verify Technical Data publications
Update Technical Data Strategy
Support initial elding of technical manuals
Accept publications/IETMs/ product data
Provide input and/or respond to ECPs/ECRs
Participate is programmatic and technical reviews
Participate in Provisioning Conference
Update inputs to the LCCE
Update the tech data IMS
Update Technical Data inputs to the LCSP
Participate as a SME advisor to the source selection process
Update Technical Data Plan
Provide Technical Data inputs to Product Support BCA update
Validated/Veried Technical
Data
Publications
IETMs
Product Data
Engineering Change
Requests/Proposals
Conguration Changes
Time Change Technical
Orders (TCTO)
Updated Technical Data Plan
Technical Data inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Execute Technical Data Plan
Verify Updated Publications
Dispose/archive of publications from all systems at end of
Principle End Item (PEI) service life
Update Technical Data inputs to the LCCE
Update the Technical Data IMS
Update Technical Data inputs to the LCSP
Engineering Change
Requests/Proposals
Conguration Changes
Time Change Technical
Orders (TCTO)
Archived publications/
technical data
Technical Data inputs to
LCSP
Support Equipment
Review ICD to identify Support Equipment requirements and
support KPPs and KSAs
Identify requirements for existing/common support
equipment
Identify requirements for specic/unique support equipment
Identify appropriate PMs for each support equipment item
Draft MOA on requirements and support of the Program
(agreement between PM and SE PMs)
Identify support equipment requirements for inclusion in RFP
Participate as a Support Equipment SME advisor to the source
selection process
Develop preliminary funding requirements for support equipment
Develop the preliminary support equipment IMS
Develop the RFP for Special SE technology development
contract
Provide Support Equipment inputs to LCSP
Develop preliminary support equipment concept
Conduct a maintenance AoA for each design alternative
Analyze new and historical technological solutions
Support PSM market research/trade studies activities
Participate in initial use study
Prepare Initial input to RAM-C Rationale Report
Supportability requirements (MTBF, MTTR, A
O
, MLDT, etc.)
System support concept
Maintenance concept
Technology Development Strategy
Provide support equipment inputs to the Product Support BCA
Develop Initial support equipment concept inputs to HSI plan
Existing/common support
equipment requirements
Requirements for
existing/common/unique
support equipment
Requirements for unique
support equipment
List of existing/common
support equipment
Support equipment IMS
Support Equipment Concept
Support Equipment inputs to:
LCSP
CARD/LCCE/ICE
RFP
TES
TDS
ICD
Product Support BCA
RAM-C Report
HSI Report
Update support equipment requirements for inclusions in RFP
Participate as a SME advisor to the source selection process
Update the support equipment IMS
Develop support equipment inputs to LCSP
Participate in technical and programmatic reviews
Review CDD to identify support equipment concepts
Support planning for and conduct of system level analyses
Tradeoff analysis
Functional analysis to identify operation and maintenance
functions
Develop initial support equipment strategy
Review maintenance concept and maintenance engineering
analysis
Research CORE (50/50) impacts
Conduct supportability analysis to inuence design
Complete 1st iteration of the RCM Analysis
Update RAM-C Rationale Report
Provide Support Equipment inputs to product support BCA
update
Analyze System Use Study/Mission Prole/CONOPS Summary
to extract:
Design reference mission prole
Functional proles
Logistics use proles
Design for testing (BIT)
Standardization and Interoperability
Inputs to initial system
training plan
Support Equipment Strategy
Support Equipment inputs to:
LCSP
Acquisition Strategy
TEMP
SEP
RAM-C Report
CDD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
LCCE/CARD
Initial FMECA
RFP
HSI Plan
Update support equipment requirements for inclusion in RFP
Award Special SE EMD contract
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the support equipment IMS
Develop support equipment Plan
Update support equipment inputs for the LCSP
Participate in technical and programmatic reviews
Update system supportability analysis
Review updated use study
Provide Support Equipment inputs to Product Support BCA
update
Update HSI Plan
Support equipment Plan
Draft Fielding Plan
Updated system
supportability analysis
Support Equipment inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update support equipment requirements for inclusions in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the support equipment IMS
Update Support Equipment plan
Update Support Equipment inputs for the LCSP
Participate in technical and programmatic reviews
Award Special SE production contract
Conduct Special SE production contract Start of Work meeting
Conduct Supportability Demonstration
Evaluate OT and Supportability Demonstration report
Conduct provisioning conference
Approve elding
Provide support to Product Support BCA
Field General and Special SE
(if applicable)
Updated Support Equipment
Plan
Support Equipment inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Execute Support Equipment Plan
Update inputs to the LCCE
Update the Support Equipment IMS
Update Support Equipment inputs for the LCSP
Monitor Support Equipment
Update Special Support Equipment documentation
Proactive System Performance Management
End of PEI Life Cycle (if not,
initiate PIP/SLEP)
If end of Life-Cycle; initiate
disposal instruction for
Special SE
Dispose of Special SE
Updated system
supportability analysis
Support Equipment inputs
to LCSP
Prognostics and Health
Management
QDR
ECP/ECR
Corrosion Control
Computer Resources
Review ICD to identify Computer Resources requirements and
support KPPs and KSAs
Participate as a SME advisor to the source selection process
Develop the preliminary Computer Resources IMS
Develop initial Computer Resources inputs to LCSP
Develop Computer Resources requirements for inclusion in RFP
Ensure design review requirements include supportability
Ensure technical reviews include an assessment of
supportability
Develop preliminary Computer Resources concept
Support PSM market research/trade studies activities/AoA
Develop Funding Requirements to Execute Computer
Resources concept
Participate in initial use study
Prepare Initial input to RAM-C Rationale Report
Supportability requirements (MTBF, MTTR, A
O
, MLDT, etc.)
System support concept
Maintenance concept
Technology Development Strategy
Provide Computer Resources inputs to the Product Support
BCA
Develop Initial Computer Resources concept inputs to HSI plan
Computer Resources IMS
Computer Resources
concept
Computer Resources inputs
to:
LCSP
CARD/LCCE/ICE
RFP
TES
TDS
ICD
BCA
RAM-C Report
HSI Report
Update computer resources requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update the Computer Resources IMS
Develop Computer Resources inputs to the LCSP
Participate in technical and programmatic reviews
Review CDD to identify Computer Resources concepts
Support planning for and conduct of system level analyses
Tradeoff analysis
Functional analysis to identify operation and maintenance
functions
Develop initial Computer Resources strategy
Research DSOR/SOR impacts
Research CORE (50/50) impacts
Conduct supportability analysis to inuence design
Complete 1st iteration of the RCM Analysis
Update RAM-C Rationale Report
Provide Computer Resources and Support inputs to Product
Support BCA update
Analyze System Use Study/Mission Prole/CONOPS Summary
to extract:
Design reference mission prole
Functional proles
Logistics use proles
Design for testing (BIT)
Standardization and Interoperability
Computer Resources
Strategy
Computer Resources inputs
to:
LCSP
Acquisition Strategy
TEMP
SEP
RAM-C Report
CDD
PESHE
CORE (50/50)
SOR/DSOR
BCA
LCCE/CARD
Initial FMECA
RFP
HSI Plan
Update Computer Resources requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the Computer Resources IMS
Develop Computer Resources Plan
Update Computer Resources inputs to the LCSP
Participate in technical and programmatic reviews
Update system supportability analysis
Review updated use study
Provide Computer Resources inputs to Product Support BCA
update
Update HSI Plan
Computer Resources Plan
Updated system
supportability analysis
Computer Resources inputs
to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update Computer Resources requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the Computer Resources IMS
Update Computer Resources plan
Update Computer Resources inputs to the LCSP
Participate in technical and programmatic reviews
Provide support to Product Support BCA
Updated Computer
Resources Plan
Updated system
supportability analysis
Computer Resources inputs
to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update inputs to the LCCE
Update the Computer Resources IMS
Update Computer Resources inputs to the LCSP
Proactive System Performance Management
Execute Computer Resources Plan
Computer Resources inputs
to LCSP
Prognostics and Health
Management
QDR
ECP/ECR
Corrosion Control
Packaging, Handling, Storage, and Transportation
Review ICD to identify PHS&T requirements and support KPPs
and KSAs
Develop initial PHS&T inputs to LCSP
Identify PHS&T requirements for inclusion in RFP
Ensure design review requirements include supportability
Ensure technical reviews include an assessment of
supportability
Participate as a PHS&T SME advisor to the source selection
process
Develop the preliminary PHS&T IMS
Develop preliminary PHS&T concept
Analyze new and historical technological solutions
Support PSM market research/trade studies activities/AoA
Develop Funding Requirements to Execute PHS&T Concept
Participate in initial use study
Prepare Initial input to RAM-C Rationale Report
Supportability requirements (MTBF, MTTR, A
O
, MLDT, etc.)
System support concept
Maintenance concept
Technology Development Strategy
Provide PHS&T inputs to the Product Support BCA
Develop Initial PHS&T concept inputs to HSI plan
PHS&T Concept
PHS&T IMS
PHS&T inputs to:
LCSP
CARD/LCCE/ICE
RFP
TES
TDS
ICD
Product Support BCA
RAM-C Report
HSI Report
Update PHS&T requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update the PHS&T IMS
Develop PHS&T inputs to the LCSP
Participate in technical and programmatic reviews
Review CDD to identify PHS&T concepts
Support planning for and conduct of system level analyses
Tradeoff analysis
Functional analysis to identify operation and maintenance
functions
Develop initial PHS&T strategy
Research DSOR/SOR impacts
Research CORE (50/50) impacts
Conduct supportability analysis to inuence design
Complete 1st iteration of the RCM Analysis
Update RAM-C Rationale Report
Provide PHS&T inputs to Product Support BCA update
Analyze System Use Study/Mission Prole/CONOPS Summary
to extract:
Design reference mission prole
Functional proles
Logistics use proles
Design for testing (BIT)
Standardization and Interoperability
PHS&T Strategy
PHS&T inputs to:
LCSP
Acquisition Strategy
TEMP
SEP
RAM-C Report
CDD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
LCCE/CARD
Initial FMECA
RFP
HSI Plan
Update PHS&T requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the PHS&T IMS
Develop PHS&T plan
Update PHS&T inputs to the LCSP
Participate in technical and programmatic reviews
Update system supportability analysis
Review updated use study
Provide PHS&T inputs to Product Support BCA update
Update HSI Plan
PHS&T Plan
Updated system
supportability analysis
PHS&T inputs to:
LCSP
SEP
TEMP
CPD
PESHE
CORE (50/50)
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update PHS&T requirements for inclusion in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the PHS&T IMS
Update PHS&T plan
Update PHS&T inputs to the LCSP
Participate in technical and programmatic reviews
Provide support to Product Support BCA
Updated PHS&T Plan
PHS&T inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update inputs to the LCCE
Update the PHS&T IMS
Update PHS&T inputs to the LCSP
Execute PHS&T Plan
Proactive System Performance Management
PHS&T inputs to LCSP
Prognostics and Health
Management
QDR
ECP/ECR
Corrosion Control
Facilities and Infrastructure
Identify Facilities and Infrastructure requirements for inclusion
in RFP
Participate as a SME advisor to the source selection process
Develop the preliminary Facilities and Infrastructure IMS
Review ICD to identify Facilities and Infrastructure requirements
and support KPPs and KSAs
Develop initial Facilities and Infrastructure inputs to LCSP
Develop preliminary Facilities and Infrastructure concept
Support PSM market research/trade studies activities/AoA
Develop Funding Requirements to Execute Facilities and
Infrastructure Concept
Participate in initial use study
Prepare Initial input to RAM-C Rationale Report
Supportability requirements (MTBF, MTTR, A
O
, MLDT, etc.)
System support concept
Maintenance concept
Technology Development Strategy
Provide Facilities and Infrastructure inputs to the Product
Support BCA
Develop Initial Facilities and Infrastructure concept inputs to
HSI plan
Facilities and Infrastructure
Concept
Facilities and Infrastructure
IMS
Facilities and Infrastructure
inputs to:
LCSP
CARD/LCCE/ICE
RFP
TES
TDS
ICD
Product Support BCA
RAM-C Report
HSI Report
Update Facilities and Infrastructure requirements for inclusion
in RFP
Participate as a SME advisor to the source selection process
Update initial Facilities and Infrastructure inputs to the LCCE
Update the Facilities and Infrastructure IMS
Develop Facilities and Infrastructure inputs to the LCSP
Review CDD to identify Facilities and Infrastructure concepts
Support planning for and conduct of system level analyses
Tradeoff analysis
Functional analysis to identify operation and maintenance
functions
Develop initial Facilities and Infrastructure strategy
Research DSOR/SOR impacts
Research CORE (50/50) impacts
Preventive and corrective maintenance tasks identied using
RCM and CBM+
Review FMECA and LORA data to support Facilities decisions
Provide Facilities and Infrastructure inputs to Product Support
BCA update
Participate in technical and programmatic reviews
Analyze System Use Study/Mission Prole/CONOPS Summary
to extract:
Design reference mission prole
Functional proles
Logistics use proles
Design for testing (BIT)
Standardization and Interoperability
Facilities and Infrastructure
Strategy
Facilities and Infrastructure
inputs to:
LCSP
Acquisition Strategy
TEMP
SEP
RAM-C Report
CDD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
LCCE/CARD
Initial FMECA
RFP
HSI Plan
Update Facilities and Infrastructure requirements for inclusion
in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the Facilities and Infrastructure IMS
Develop Facilities and Infrastructure plan
Update Facilities and Infrastructure inputs to the LCSP
Participate in technical and programmatic reviews
Update system supportability analysis
Review updated use study
Provide Facilities and Infrastructure inputs to Product Support
BCA update
Update HSI Plan
Facilities and Infrastructure
Plan
Updated system
supportability analysis
Facilities and Infrastructure
inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update Facilities and Infrastructure requirements for inclusion
in RFP
Participate as a SME advisor to the source selection process
Update inputs to the LCCE
Update the Facilities and Infrastructure IMS
Update Facilities and Infrastructure plan
Update Facilities and Infrastructure inputs to the LCSP
Participate in technical and programmatic reviews
Provide support to Product Support BCA
Updated Facilities and
Infrastructure Plan
Facilities and Infrastructure
inputs to:
LCSP
Acquisition Strategy
SEP
TEMP
CPD
PESHE
CORE (50/50)
SOR/DSOR
Product Support BCA
IMS
LCCE/CARD
HSI Plan
Update inputs to the LCCE
Update Facilities and Infrastructure inputs to the LCSP
Execute Facilities and Infrastructure Plan
Update the Facilities and Infrastructure IMS
Proactive System Performance Management
Facilities and Infrastructure
inputs to LCSP
Prognostics and Health
Management
QDR
ECP/ECR
Last Reviewed: 27 November 2012
▲ MS C
▲ MS B
▲ MS A
MDD
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭