**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-33 11 13 (August 2017)
------------------------------------
Preparing Activity: USACE Superseding
UFGS-33 20 00 (
April 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 33 - UTILITIES
SECTION 33 11 13
POTABLE WATER SUPPLY WELLS
08/17
PART 1 GENERAL
1.1 UNIT PRICES
1.1.1 Test Well
1.1.2 Water Well
1.1.3 Observation Well
1.1.4 Geophysical Logging
1.1.5 Well or Test Well Decommissioning or Abandonment
1.1.6 Cleanup
1.2 REFERENCES
1.3 ADMINISTRATIVE REQUIREMENTS
1.3.1 Notification
1.3.2 Delivery, Storage, and Handling
1.3.3 Project and Site Conditions
1.3.4 Water Well Design Requirements
1.3.4.1 Well Installation Plan
1.3.4.2 Test Wells
1.3.4.3 Sampling for Geotechnical Analysis
1.3.4.4 Observation Wells
1.3.4.5 Geophysical Logging
1.3.5 Qualifications
1.4 SUBMITTALS
PART 2 PRODUCTS
2.1 CASING
2.1.1 Steel Casing and Couplings
2.1.2 Plastic Casing and Couplings
2.2 WELL SCREENS
2.2.1 Metal Screen
2.2.2 Plastic Screen
2.2.2.1 Plastic Pipe
2.2.2.2 Bonding Materials
2.2.2.3 Plastic Well Screen
SECTION 33 11 13 Page 1