AFMAN11-2C-130JV3ADBCL-2 C-130J Maffs操作装载员检查表

VIP文档

ID:58353

大小:0.11 MB

页数:17页

时间:2023-06-04

金币:10

上传者:战必胜
BY ORDER OF THE AFMAN 11-2C-130JV3 ADD B CL-2
SECRETARY OF THE AIR FORCE 26 JUNE 2018
Flying Operations
C-130J MAFFS OPERATIONS LOADMASTER CHECKLIST
COMPLIANCE WITH THIS PUBLICATION IS MANDATORY
ACCESSIBILITY: Publications and forms are available for downloading or
ordering on the e-Publishing website at www.e-Publishing.af.mil
RELEASABILITY: Access to this publication (or associated documents) is
restricted: requests for accessibility must be approved by the OPR.
OPR: HQ AMC/A3V Certified by: HQ USAF/A3T
Supersedes: AFI 11-2C-130JV3 ADD B CL-2 (Maj Gen Scott F. Smith)
Date: 18 Nov 2014
Number of Pages: 17
___________________________________________________________________
This checklist establishes procedures for employing the Modular Airborne Fire
Fighting System (MAFFS) on C-130J aircraft employed by Mobility Air Forces
(MAF) to accomplish their worldwide mission. This checklist complements
AFMAN 11-2C-130J-V3, Operations Procedures, and is printed on standard 8 ½” x
11” bond paper, and trimmed to fit the standard plastic aircrew checklist binders.
This checklist is intended to provide MAFFS certified crewmembers quick reference
to procedures required for the safe execution of MAFFS ground and flight
operations. All MAFFS certified C-130J loadmasters will carry this annex.
Refer recommended changes and questions about this publication to the Office of
Primary Responsibility (OPR) using the AF IMT 847, Recommendation for Change
of Publication; route AF IMT 847s from the field through the appropriate chain of
command.
TABLE OF CONTENTS
Checklist Page
PART ONE NORMAL PROCEDURES ....................... 3
MAFFS PRE-FLIGHT CHECKLIST .......................................... 3
ELECTRICAL PRE-FLIGHT CHECKLIST ............................. 4
MAFFS RETARDANT/WATER/FOAM SERVICING
PROCEDURES ............................................................................... 6
MAFFS GROUND AIR SERVICING PROCEDURES ............. 7
MAFFS BEFORE TAKEOFF CHECKLIST .............................. 8
MAFFS AFTER TAKEOFF CHECKLIST ................................. 9
SLOWDOWN CHECKLIST ......................................................... 9
DROP PREPARATION CHECKLIST ........................................ 9
ONE MINUTE ADVISORY ........................................................ 10
RELEASE POINT CHECKLIST ............................................... 10
COMPLETION OF DROP CHECKLIST ................................. 11
MAFFS WEIGHT TABLES ........................................................ 12
MAFFS BEFORE LANDING CHECKLIST ............................ 13
MAFFS AFTER LANDING CHECKLIST ............................... 13
RETARDANT DE-SERVICING PROCEDURES .................... 14
SYSTEM DE-ARMING CHECKLIST ...................................... 14
BEFORE LEAVING AIRPLANE .............................................. 15
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭