USACE / NAVFAC / AFCEC / NASA UFGS-09 06 00 (August 2022)
------------------------------------
Preparing Activity: USACE Superseding
UFGS-09 06 90 (
May 2009)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 06 00
SCHEDULES FOR FINISHES
08/22
PART 1 GENERAL
1.1 SUMMARY
1.2 SUBMITTALS
1.3 COLOR REFERENCE SYSTEMS
PART 2 PRODUCTS
2.1 CONTRACTOR COLOR BOARDS
2.2 COLOR SCHEDULE
2.3 EXTERIOR FINISHES
2.3.1 Exterior Walls
2.3.1.1 Brick
2.3.1.2 Mortar
2.3.1.3 Concrete Masonry Units ([Integrally
Colored][Rock/Split-Faced][Ribbed][Burnished][_____])
2.3.1.4 Metal Wall Panels, Hardware, and Associated Trim
2.3.1.5 Insulation and Finish System
2.3.1.6 Precast Concrete
2.3.1.7 Precast Stone
2.3.1.8 Glass and Glazing
2.3.1.9 Paint
2.3.1.10 Cement Board Siding and Trim
2.3.1.11 Cultured Stone
2.3.1.12 Screen Wall
2.3.2 Exterior Trim
2.3.2.1 Steel Doors and Door Frames
2.3.2.2 Steel Windows (mullion, muntin, sash, trim, and sill)
2.3.2.3 Aluminum Doors and Door Frames
2.3.2.4 Aluminum Windows (mullion, muntin, sash, trim, and sill)
2.3.2.5 Wood Clad Windows (mullion, muntin, sash, trim, and sill)
2.3.2.6 Window Screens
2.3.2.7 Wood Stain
2.3.2.8 Fascia