**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-09 62 38 (August 2017)
Change 1 - 08/18
------------------------------------
Preparing Activity: USACE Superseding
UFGS-09 62 38 (
November 2012)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 62 38
STATIC-CONTROL FLOORING
08/17, CHG 1: 08/18
PART 1 GENERAL
1.1 REFERENCES
1.2 SCHEDULING
1.3 SUBMITTALS
1.3.1 Samples
1.3.1.1 Static-Control Resilient Flooring
1.3.1.2 Static-Control Carpet
1.3.1.3 Moldings
1.3.1.4 Special Treatment Materials
1.3.1.5 Operations and Maintenance Data
1.4 CERTIFICATIONS
1.4.1 Indoor Air Quality Certifications
1.4.1.1 Floor Covering Materials
1.4.1.2 Adhesives
1.5 EXTRA MATERIALS
1.6 QUALITY ASSURANCE
1.7 DELIVERY, STORAGE, AND HANDLING
1.7.1 Static-Control Resilient Flooring
1.7.2 Static-Control Carpet
1.8 ENVIRONMENTAL CONDITIONS
1.8.1 Static-Control Resilient Flooring
1.8.2 Static-Control Carpet
1.9 WARRANTY
1.9.1 Static-Control Resilient Flooring
1.9.2 Static-Control Carpet
PART 2 PRODUCTS
2.1 STATIC-CONTROL RESILIENT FLOORING
2.1.1 Conductive Resilient Flooring
2.1.1.1 Conductive Vinyl Tile
2.1.1.2 Conductive Rubber Tile
2.1.1.3 Conductive Rubber Sheet Flooring
SECTION 09 62 38 Page 1