**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-32 14 13.13 (November 2019)
------------------------------------
Preparing Activity: USACE Superseding
UFGS-32 16 15 (
April 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 14 13.13
INTERLOCKING PRECAST CONCRETE UNIT PAVING
11/19
PART 1 GENERAL
1.1 PAYMENT PROCEDURES
1.1.1 Pavements
1.1.2 Edge Restraint
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DELIVERY, STORAGE AND HANDLING
1.5 QUALITY ASSURANCE
1.5.1 Concrete Paver Installer Certification
1.5.2 Pre-Construction Meeting
1.5.3 Weather Requirements
1.5.4 Field-Constructed Mock-Up
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Bedding and Jointing Sand
2.1.2 Concrete Paving Unit
2.1.3 Edge Restraints
2.1.3.1 Precast Concrete
2.1.3.2 Cast-in-Place Concrete
2.2 TESTS, INSPECTIONS AND VERIFICATIONS
2.2.1 Paving Unit
2.2.1.1 Freezing and Thawing
2.2.1.2 Dimensional Tolerance
2.2.1.3 Compressive Strength
2.2.1.4 Retest
2.2.2 Bedding and Jointing Sand
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Edge Restraint Location
SECTION 32 14 13.13 Page 1