**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-32 96 00 (August 2017)
Change 1 - 08/21
------------------------------------
Preparing Activity: NAVFAC Superseding
UFGS-32 96 00 (
February 2010)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 96 00
TRANSPLANTING EXTERIOR PLANTS
08/17, CHG 1: 08/21
PART 1 GENERAL
1.1 REFERENCES
1.2 RELATED REQUIREMENTS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 State Landscape Contractor's License & Tree Relocation
References
1.4.2 Permits
1.4.3 Photographs
1.4.4 Transplanting Plan
1.4.5 Pre-Installation Meeting
1.4.6 Soil Test
1.4.7 Percolation Test
1.5 DELIVERY OF MATERIALS
1.5.1 Soil Conditioners Delivery and Storage
1.6 PLANT MATERIAL IDENTIFICATION
1.7 INSPECTION OF MATERIALS
1.8 HANDLING OF PLANT MATERIALS
1.9 TIME LIMITATION
1.10 GUARANTEE
1.11 TRANSPLANTED PLANT MATERIAL TIME AND CONDITIONS
1.11.1 Deciduous Plant Material Time
1.11.2 Evergreen Plant Material Time
1.11.3 Transplanting Conditions
1.11.4 Underground Utilities
1.11.5 Protecting Existing Vegetation
1.11.6 Protection of Plant Material to be Transplanted
1.11.7 Protection of Plant Material During Transplanting
PART 2 PRODUCTS
2.1 TOPSOIL
2.2 SOIL CONDITIONERS
SECTION 32 96 00 Page 1