二战飞机手册 bf-109k-4_english

ID:32847

大小:0.02 MB

页数:8页

时间:2023-01-29

金币:50

上传者:战必胜
I. Instrument Panel
A. Description
Positioned on the instrument panel are all the engine-monitoring,
Flight monitoring and navigation instruments.
The instrument panel is secured with hex-head screws to the instru-
ment panel frame, which is bolted to the forward part of the windscreen
assembly.
On the instrument panel frame are positioned the monitoring equip-
ment for the armament installation and the pressure gauge for the MW
installation (see Part 7B).
On the bottom edge of the instrument panel a hinged auxiliary panel
is attached, which can be fixed in the upward position, and that latches to
the cover of the MK 108 in the lowered position. On this auxiliary panel
the ZSK 244A is fitted (see Part 8A).
Especially sensitive instruments: AFN-2 indicator, vertical speed
indicator, artificial horizon, airspeed indicator, altimeter, and the re-
peater compass are mounted separately on an instrument Flight panel,
which is attached to the main panel by vibration dampening mounts.
B. Installation and Removal
Before removing the instrument panel. Remove the auxiliary panel;
to do this first release the latch and then attachments to the instrument
panel.
Release all cable connections on the rear of the auxiliary panel and
remove the auxiliary panel with the ZSK 244A from the cockpit.
In a similar manner, remove the instrument Flight panel from the
instrument panel.
After that remove all electrical leads, electrical plugs, piping and
Flexible cables from the rear of the instruments and remove the instru-
ment panel with the attached instruments from the instrument panel frame
after removing the four mounting screws.
When disconnecting electrical leads note that all leads are provided
with ID tags.
Seal pipe and tubing ends as well as connections on the instruments
as protection against contamination.
Installation of the instrument panel follows likewise in reverse se-
quence. The instruments are installed before the installation of the instru-
ment panel.
Attachment of the instruments to the instrument panel is almost
exclusively by slotted head screws, that are screwed into captive nuts (fixed
to the rear face of the instrument panel). When tightening the mounting
screws watch that the screws are tightened uniformly so that the instru-
ment glass is not cracked.
The limit markings are indicated on the instruments by adjustment
marks or by red marks.
Ill. 1: Equipment Layout in the Cockpit
1 Horizontal Stab. Trim
2 Flap Handwheel
3 Cabin Vents
4 Fuel Selector Handle
5 Tail Wheel Lock
6 Glove Heater Plug
7 Stabilizer Trim Indicator
8 Engine Primer Hand Pump
9 Bomb or Drop Tank jettison
10 Prop Pitch Auto/Man. Switch
11 Man. Coolant Valve Controls *
12 Momentary Limit Switch
13 Quick-Stop Handle
14 Fuel Selector & Cutoff
15 Winter Start Handle
16 Throttle with Thumb Switch for Prop Pitch Control
17 Motor Generator for Artificial Horizon
18 UV Cabin Lights
19 Canopy jettison Handle
20 Starter Handle
21 Landing Gear Push Buttons
22 Selector Switch for 21 cm Rockets or MK 108 **
23 Landing Gear Indicators
24 Magneto Switch
25 Switch for MW Installation
26 Jettison Switch for 21 cm Rocket Tubes **
27 Windscreen Cleaning Valve
28 Main Elect. Circuit Breaker
29 Master Weapon Switch
30 Ammunition Counters & Indicators
31 Armor Glass Windscreen
32 Gun Sight Revi 16B
33 Gun Sight Mount
34 Pressure Gauge for MW Installation
35 Airspeed Indicator
36 Artificial Horizon
37 Vertical Speed Indicator
38 Altimeter
39 Repeater Compass
40 AFN2 Instrument Flight Indicator
41 Instrument Flight Panel
42 Fuel & Oil Pressure Gauge
43 Coolant Temperature Gauge
44 Tachometer
45 Flare Gun Port
46 Oil Temperature Gauge
47 Prop Pitch Indicator
48 Manifold Pressure Gauge
49 Emergency Land. Gear Release
50 Low Fuel Warning Light
51 ZSK 244A Bomb Arming Panel
52 Cover for MK 108
53 Control Column Grip
54 Charging Button For MK 108
55 B2 Button for Bomb Release
56 B1 Button for MK 108 or Rockets
57 A Button for MG 131
58 Radiator Flap Control
59 Fuel jettison Handle
60 Circuit Breaker Panel
61 Compass Deviation Card
62 Oxygen Monitor
63 Oxygen Pressure Gauge
64 Drop Tank Fuel Transfer Sight Glass
65 Oxygen Regulator
66 Main Valve for Oxygen System
67 Control for FuG 16ZY Radio
68 Frequency Selector for FuG 16ZY Radio
69 Headphone Volume Control
70 Control for FuG 25a (IFF) Radio
71 Headphone Jack
72 Oxygen Mask Hose
* only on initial A/C
** omitted in later A /C
II. Engine Monitoring Instruments
A. Description
The following instruments are installed as engine monitoring
instruments (see Ill. 2):
1 Manifold Pressure Gauge (Ill. 2/1)
1 Tachometer (Ill. 2/2).
1 Propeller Pitch Indicator (Ill. 2/3)
1 Dual Pressure Gauge for Oil & Fuel (Ill. 2/4).
1 Thermocouple for Oil (Ill. 2/5)
1 Thermocouple for Coolant (Ill. 2/6)
1 Temperature Gauge for Oil (Ill. 2/7)
1 Temperature Gauge for Coolant (Ill. 2/8)
1 Fuel Level Transmitter for Fuel (Ill. 2/9)
1 Fuel Contents Gauge (Ill. 2/10)
1 Low Fuel Warning Light (Ill. 2/11)
1 Pressure Gauge for MW Installation (Ill. 2/12)
For the above listed instruments see also Part 6, in which the
powerplant equipment is also covered.
Bf 109K-4
Aircraft Handbook
Part 9A General Equipment
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭