DI ALSS 81533 数据项说明 政府提供的材料(GFM)和最终项目交易报告系统(G009)(1997年1月24日)

ID:43909

大小:0.08 MB

页数:2页

时间:2023-03-17

金币:20

上传者:战必胜
DATA ITEM DESCRIPTION
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information IS estimated to average 110 hours per re$ponse, including the time for reviewing instructions, marching ex!sting data sources,
gathering and maintaining the data needed, and completing and rewewing the collemon of information. Seed comments regarding th!} burden estimate or any other aspect Of this
collection of information, including sugge$tiom for reducing this burden, to Washington Iieadquafiers Services. Directorate for Information Operatiom and Reports, 1215 Jefferson
DWIS
Highway, Suite 1204. Arlington, VA 222024302, and to the Office of Management and Budget, Paperwork Reduction Project (07044 188), Washington, DC 20503.
1.
TITLE
Government Furnished Material (GFM) and End Item
2. IDENTIFICATION NUMBER
Transaction Report
DI-ALSS-81533.
3. DESCRIPTIONIPURPOSE
3.1 To provide GFM and end item transaction data for the contract depot maintenance
business area and to establish national stock number visibility of contractor GFM
usage and inventories.
!.
APPROVAL DATE
5. OFFICEOF PRIMARY RESPONSIBILITY (OPR)
{YYMMDD)
6a. DTIC APPLICABLE 6b. GlDEPAPPLlCABLE
F/AFMC/FMRI
970124
7. APPLICATION/lNTERREL.ATIONSHIP
7.1 This data item description contains the format, content.and preparation instructions
for the data product generated by the specific and discrete task requirements as
delineated in the contract.
7.2 This data item description may be used on any depot level maintenance repair contract.
7.3 This DID supersedes DI-L-3341A.
7.4 There is no single distribution point for AFMCM 66-266’,Vol I; obtain as stated in the
contract.
1.
APPROVAL LIMITATION
9a. APPLICABLE FORMS
9b. AMSC NUMBER
F7224
10. PRE A ATION INSTR CTIONS
l’O.~ }ormat anticontent.
See AFMCM 66-266, Vol II for guidance.
The report shall contain
the following action Lode data elements:
A
Receipt of GFM from DOD supply activity
B Acquisition of contractor acquired property or manufactured items
c Receipt of GFM from other contracts or reclamation
D Issues of material to repair line
E
Issue of material to support shop
F
Turn-in GFM from repair line
G Plant clearance or condemnation of serviceable GFM
Turn-in serviceable GFM to USAF supply (includes redistribution orders)
.,
H
J
Transfer to another contract or contractor
K Receipt of C/ELIN
M
Condemned C/ELIN
N
Turn-in to contractor warehouse of unserviceable in work C/ELIN
P Repair of C/ELIN completed
Q
Shipment of serviceable C/ELIN
s Repair of GFM
T
Turn-in of investment component to contractor warehouse
u Shipment or transfer of unserviceable investment compon~nt
v
Shipment of unserviceable C/ELIN
Il. DISTRIBUTION STATEME!’!T
DISTRIBUTION STATEMENT A:
Approved for public release; distribution
is unlimited.
--- . -- . - -- -a . 1 -J
w Form lbb4, AFW UY
Previous edtlons are obsolete. Page
OF
Pages
.. ..
—.
I
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭