DATA ITEM DESCRIPTION
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions,
searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments
regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington
Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va 22202-4302, and
to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503.
1. TITLE
PROPOSED CRITICAL MANUFACTURING PROCESS
DESCRIPTION (PCMPD)
2. IDENTIFICATION NUMBER
DI-CMAN-81012A
3. DESCRIPTION/PURPOSE
3.1 The Proposed Critical Manufacturing Process Description (PCMPD) identifies processes which are proposed for
inclusion in the technical data package (TDP) as mandatory to meet the engineering requirements of the item or a
component part thereof for which the TDP is being prepared.
4. APPROVAL DATE
970521
5. OFFICE OF PRIMARY
RESPONSIBILITY(OPR)
AR
6a. DTIC REQUIRED 6b. GIDEP REQUIRED
7. APPLICATION/INTERRELATIONSHIP
7.1 This Data Item Description (DID) contains the format and content preparation instructions for the data
resulting from the work task described by 3.7.3 of MIL-DTL-31000A.
7.2 This DID is applicable to acquisitions in which the Government intends to retain approval authority over the
designation of manufacturing processes as mandatory.
(Continued on page 2)
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER
D7232
10. PREPARATION INSTRUCTIONS
10.1 Reference Documents. The applicable issue of documents cited herein, including their approval dates and the dates
of applicable amendments, notices and revisions, shall be as cited in the contract.
10.2 General. The PCMPD shall meet the requirements of MIL-DTL-31000A.
10.3 Format. The PCMPD shall be in the contractor’s format.
10.4 Content. The PCMPD shall include as applicable:
a. Contractor’s name, address and CAGE Code.
b. Contract number.
(Continued on page 2)
11. DISTRIBUTION STATEMENT
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
DD FORM 1664 APR 89 (EF-V1) PREVIOUS EDITIONS ARE OBSOLETE Page _1_ of _2_pages
Downloaded from http://www.everyspec.com