DATA ITEM DESCRIPTION
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions,
searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments
regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington
Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va 22202-4302, and
to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503.
1. TITLE
SOURCE CONTROL DRAWING APPROVAL REQUEST
2. IDENTIFICATION NUMBER
DI-DRPR-81010A
3. DESCRIPTION/PURPOSE
3.1 The Source Control Drawing Approval Request provides the Government with a means for approving or
disapproving
the use of source control drawings for specific items selected for use in the equipment.
4. APPROVAL DATE
970521
5. OFFICE OF PRIMARY
RESPONSIBILITY(OPR)
AR
6a. DTIC REQUIRED 6b. GIDEP REQUIRED
7. APPLICATION/INTERRELATIONSHIP
7.1 This Data Item Description (DID) contains the format and content preparation instructions for a Source
Control Drawing Approval Request resulting from the work task described by 3.7.1 of MIL-DTL-31000A.
7.2 This DID is intended for use in data acquisitions which will result in source control drawings which the
Government may use for future procurements.
(Continued on page 2)
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER
D7230
10. PREPARATION INSTRUCTIONS
10.1 Reference Documents. The applicable issue of documents cited herein, including their approval dates and the dates
of applicable amendments, notices, and revisions, shall be as cited in the contract.
10.2 General. Source Control Drawing Approval Requests shall meet the requirements of MIL-DTL-31000A.
10.3 Format. Source Control Drawing Approval Requests shall be in the contractor’s format.
10.4 Content. The request shall specify the following:
a. Nomenclature and description of the item.
b. The critical application(s) for which the item is to be used.
c. Number of applications per end item.
(Continued on page 2)
11. DISTRIBUTION STATEMENT
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
DD FORM 1664, APR 89 (EF-V1) PREVIOUS EDITIONS ARE OBSOLETE. Page _1_ of _2_pages
Downloaded from http://www.everyspec.com