DATA ITEM DESCRIPTION
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503.
1. TITLE
Electromagnetic Environmental Effects (E3) Verification
Report (E3VR)
2. IDENTIFICATION NUMBER
DI-EMCS-81542
3. DESCRIPTION/PURPOSE
3.1 The E3VR describes the tests, analyses, and inspections used by the contractor and documents the
results verifying compliance with the E3 interface and performance requirements of a system.
3.2 The E3VR provides the means for the government to evaluate E3 verification results.
4. APPROVAL DATE
(YYMMDD)
970318
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
F-11
6a. DTIC APPLICABLE
X
6b. GIDEP APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
7.1 This Data Item Description (DID) contains the format and content preparation instructions for data
resulting from the work task described by 4.1 of MIL-STD-464.
7.2 This DID is intended for airborne, sea, space, and ground systems, including associated ordnance.
7.3 This DID is normally applied to the engineering and manufacturing development phase of a program, but
it can be used in any phase.
7.5 This DID is related to DI-EMCS-81540 and DI-EMCS-81541.
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER
A7255
10. PREPARATION INSTRUCTIONS
10.1 Format. Contractor format is acceptable.
10.2 Content. The E3VR shall describe the overall verification results (test, analysis, and inspection, as
applicable) for each E3 requirement specified in the contract for the system being developed.
10.2.1 Summary information. The procedures shall summarize the following:
10.2.1.1 Introduction,background.
(Continued on page
2)
11. DISTRIBUTION STATEMENT
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
DD Form 1664, APR 89 Previous editions are obsolete Page_1_of _3_Pages
Downloaded from http://www.everyspec.com