DATA ITEM DESCRIPTION
FormAQPmusd
OMB No.0704-0188
PIL_&~- L91KIm
f= IIIIs CCS~ d LdC.71=4kil h etititi 10 W=g. 110 hWTX F ICSFC.UO, k&dbUl tfl. th. f~ tihQ bl-s, SWTilho CdSth’J dala WWCCS,
@lcrLw .6 m?htahlng the 6* deeded, and Cnmpnrhg and redmlhg the C@k8JLn al Wanw!bm, SUM —
Ismwdbhl tiistien es+hate .mwciher .swciofwscmnc$m
ot M-, Wix&r,q q.Unm 1. redti W. km., to WasM@m Headqua,ien Servims, Dheciaala 1. Ihd- OFCMQIS and
Rwcwis, 1245 Jell- W Hi$way,
SUM
12W, Adm@n, VA 222024202, and la U!. OK!! M Mamgumrd end 8udLI% Pwewm+k Rtiuclbm Wed (07044180), Vk@!bwlm, 0S 2C=03.
mLE 2.IDENTIFICATION NUMBER
TEST
FACILITY REQUIREMENTS DOCUMENT (TFRD) DI-FACR-8081OA
DESCRIPTIOWURPOSE
3.1 The
TFRD identifies contractor needs for the use of government test facilities and
contractor and government responsibilities.
Its principal use is for the advanced planning
of test facility requirements and workload.
APPROVAL DATE 5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
8S DTIC APPLICABLE
6b, GIDEP APPLICABLE
(YtMMOOJ
970124
F/AFMC-DOP
APPLISATlONflNTERREIATlONSHIP
7.1
This Data Item Description (DID) contains the format and content preparation
instructions for the data product generated by the specific and discrete task requirement
as delineated in the contract.
7.2 This DID is applicable to engineering (developmental) , preliminary qualification,
qualification, and acceptance testing.
7.3 Thi6 DID interrelates with che Test Information Sheet and supersedes DI-FACR-8081O.
ea.
APPLICABLE FORMS
9b, AMSC NUMBER
F7228
0.
PREPARA710N INSTRUCTIONS
10.1 Format. Contractor format is acceptable.
10.2
Content.
Each
document shal 1 include the following infm-mat ion:
10.2.1
Section A.
Information needed by tbe government to verify the need for tbe
facility and to determine its availability and suitability for the particular test
This
section shall include:
a.
Why the facility is needed, the extent it is needed,
and impact on the test prcgram
if the facility cannot be provided.
b. Estimated dates for facility pretest preparation, initiation of tests, completion
of tests, and post test disassembly.
c.
Description of any unusual test item features which could require facility
modification or unusual support.
d. The test item’s operational and physical characteristics compared to tbe
capabilities, limitations,
and operations of the proposed test facility.
(Continued on page 2)
?.DISTRIBIMONSTATEMENT
DISTRIBUTION STATEMENT A :
APPROVED FOR PUBLIC RELEASE ; DISTRIBUTION IS UNLIMITED.
ID Form 1664, APR 89 Pie** Ecmbns am obsolek
Page .2 of ~ Pages