DATA ITEM DESCRIPTION (DID)
Title: PROGRAM COST AND TECHNICAL DATA REPORTS
Number: DI-FNCL-80166C Approval Date: 21 June, 2010
AMSC NUMBER: 9126 Limitation: N/A
DTIC Applicable: N/A GIDEP Applicable: N/A
Office of Primary Responsibility: NS/BA012
Applicable Forms: N/A
Use/Relationship:
Program Cost and Technical Data Reports provide the contractor’s cost associated with a
Government contract issued to acquire a program, project, or system.
This Data Item Description (DID) is applicable to all cost-reimbursement, and all incentive based
Research, Development, Test, and Evaluation (RDT&E) and Procurement funded contracts over
$25 million in total value. Amounts shall be reported through cost to the Government including
General & Administrative (G&A) cost, but shall not include cost of money or Fee, unless
otherwise noted.
This DID requires the reporting of all contract costs to a level of detail comparable to that presented in the
standard Cost Breakdown Structure (CBS) in Format 1. This CBS is applicable to a single program or
increment as specified in the accompanying CDRL. Costs included in these reports shall be current as of
sixty (60) calendar days (or less) prior to submission. Costs included in the initial submission shall reflect
the final negotiated position between the Government and the prime contractor. Cost data for the final
report(s) shall be from the prime contractor’s internal financial accounting system. This DID requirement
and all associated reporting requirements shall be flowed down to all subcontractors and other company
divisions whose efforts comprise over $10 million or more than 25% of the total prime contract value. The
prime contractor shall generate one consolidated report (Formats 1, 2 and 3) that shall be delivered to the
Government that includes the prime contractor and all subcontractors/inter-divisions. In addition, all
Formats 1 through 3 that were completed by subcontractors or other company divisions must also be
provided to the Government.
The initial submission of the DID is due within 60 days of contract award (or exercise of option) of each
increment. If a rebaselining of a program or increment or a major Engineering Change Proposal (ECP) is
negotiated, all Formats 1 through 3 will be resubmitted with the rebaselined amounts within 60 days of the
negotiated rebaseline date. The initial submission shall contain the latest Estimate-At-Completion (EAC).
The final report is due within 60 days or less after each increment is delivered and accepted by the
Government or is terminated by the Government. The final submission will include all costs for the
increment to include any outstanding obligations/commitments. The reporting period for the DID shall be
from the start date of the current increment to the end date of the current increment. Each submission
will be subject to Government approval. Specifically, the NSA Cost Analysis and Earned Value
Management (EVM) Office or the organization specified in the DID will be the final approval authority.
This includes approval of the methods used to map lower level costs into end item costs of the prime,
subcontractors and Government. A post award meeting shall be scheduled within 30 days of final
contract award with the Government program office, the prime contractor, and representatives from the
approving authority to ensure all DID reporting requirements are understood by the reporting contractor.
This DID supersedes DI-FNCL-80166B.
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭