DI QCIC 81870 数据项说明 变更安装团队质量保证手册(2012年9月14日)

ID:44714

大小:0.02 MB

页数:1页

时间:2023-03-17

金币:20

上传者:战必胜
DATA ITEM DESCRIPTION
Title: Alteration Installation Team Quality Assurance Workbook
Number: DI-QCIC-81870 Approval Date: 20120914
AMSC Number: N9285 Limitation: N/A
DTIC Applicable: N/A GIDEP Applicable: N/A
Office of Primary Responsibility: SH/NSWC PHD A03/RP
Applicable Forms: N/A
Use/relationship: This Workbook will be used to document process surveillances and product
inspection results, and to also document spot checks.
This DID contains the format and content preparation instructions for the data product generated by
the specific and discrete task requirement as delineated in the contract.
Reference cited in DID can be obtained from www.fmp.navy.mil or Commander, Naval Sea Systems
Command, Washington Navy Yard, D.C. 20376-0001.
Requirements:
1. Reference Documents: The applicable issue of documents cited herein, including approval dates
and dates of any applicable amendments, notices and revisions shall be as cited in the current issue of
the ASSIST database at
http://assist.daps.dla.mil.
2. Format. The Alteration Installation Team Quality Assurance Workbook shall be presented in the
Contractor’s format.
3. Content. The Alteration Installation Team Quality Assurance Workbook shall contain all of the
information specified in NAVSEA Technical Specification 9090-310F, 3.12.1.5.
3. END OF DI-QCIC-81870.
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭