DI SAFT 80103C 数据项说明 工程变更建议系统安全报告(ECPSSR)(2015年6月12日)

ID:44751

大小:0.08 MB

页数:1页

时间:2023-03-17

金币:20

上传者:战必胜
DATA ITEM DESCRIPTION
Title: ENGINEERING CHANGE PROPOSAL SYSTEM SAFETY REPORT (ECPSSR)
Number: DI-SAFT-80103C
Approved Date: 20150612
AMSC Number: F9552
Limitation: N/A
DTIC Applicable: No
GIDEP Applicable: No
Preparing Activity: 40 (AFMC/SE)
Project Number: SAFT-2015-005
Applicable Forms: N/A
Use/Relationship: The Engineering Change Proposal System Safety Report (ECPSSR) is
used to summarize results of analyses, tests and trade-
off studies conducted on proposed
engineering design changes throughout the system life cycle.
a. This Data Item Description (DID) contains the content and format preparation instructions
for the data product generated by the specific and discrete task requirement as delineated in
the contract.
b. This DID is related to DI-SAFT-80101, System Safety Hazard Analysis Report (SSHAR)
;
DI-SAFT-80102, Safety Assessment Report (SAR); DI-SAFT-80104, Waiver or Deviation
System Safety Report (WDSSR); DI-SAFT-80105, System Safety Program Progress Report
(SSPPR); and DI-SAFT-80106, Health Hazard Assessment Report (HHAR).
(Copies of these DIDs are available online at http://quicksearch.dla.mil
.)
c. This DID supersedes DI-SAFT-80103B.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their
approval dates and dates of any applicable amendments, notices, and revisions, shall be as
specified in the contract.
2. Format. The ECPSSR shall be in the contractor’s format.
3. Content. The ECPSSR shall include the following information resulting from a review of
each ECP. When it is determined that there are no hazards, a description of t
he analysis
process and factors which allowed this conclusion shall be included.
a. A list, in narrative or tabular form, of all hazards associated with the ECP. This includes
all new hazards as well as hazards that were previously identified and were elimin
ated or
controlled, and are affected by this ECP (i.e., their risk has been reduced or increased).
b. A risk assessment of these hazards. This shall include a pre-ECP and post-ECP
as
sessment with severity and probability of occurrence.
c. The safety impact of the ECP upon the existing system.
d. A historical system safety summary as it relates to the ECP and reason for the ECP.
e. An identification of any update(s) of existing hazard analyses required to incorporate the
effect(s) of the engineering change if the change is authorized.
End of DI-SAFT-80103C
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭