AFI11-2C-130V3CL-10 装载机长Maffs检查表

VIP文档

ID:58019

大小:0.17 MB

页数:32页

时间:2023-06-04

金币:10

上传者:战必胜
BY ORDER OF THE AFI 11-2C-130V3 CL-10
SECRETARY OF THE AIR FORCE 17 APRIL 2000
Flying Operations
LOADMASTER MAFFS CHECKLIST
This checklist establishes procedures for the operation of C-130
aircraft employed by Mobility Air Forces (MAF) to accomplish
their worldwide missions.
This checklist complements AFI 11-2C-130V3, C-130 Operations
Procedures, and is printed on standard 8 ½” x 11” bond paper then
trimmed to a unique size 4 ½ “ x 6 ½” that will fit the standard
plastic C-130 aircrew checklist binders. Units may request copies
of this checklist printed on a water proof-based media (in the size
outlined) from the OPR. This product reduces weight and
eliminates the need for plastic inserts. Limit water proof copies to
aircrew only for use in-flight and training purposes.
Summary of Revisions: Redundant pages removed.
PART ONE - NORMAL PROCEDURES
MAFFS PRE-FLIGHT CHECKLIST.....................................3
ELECTRICAL PRE-FLIGHT CHECKLIST..........................3
AIR CHARGING PROCEDURES FOR MANUAL
EMERGENCY DROP SYSTEM ........................................6
MAFFS RETARDANT AND AIR SERVICING
PROCEDURES...................................................................7
MAFFS IN-FLIGHT OPERATING PROCEDURES
(OTHER THAN INCREMENTAL SYSTEM) ...................9
Supersedes AFI 11-2C-130V3 CL-10, 1 April 2000
OPR: HQ AMC/DOV (CMS Finnegan)
Certified by: HQ USAF/XOO (Maj Gen Michael S. Kudlacz)
Number of Printed Pages: 32 Distribution: F
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭