SECTION 01 45 00.00 20
QUALITY CONTROL
11/11, CHG 8: 02/21
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 INFORMATION FOR THE CONTRACTING OFFICER
1.4 QC PROGRAM REQUIREMENTS
1.4.1 Commissioning
1.4.2 Acceptance of the Construction Quality Control (QC) Plan
1.4.3 Preliminary Construction Work Authorized Prior to Acceptance
1.4.4 Notification of Changes
1.4.5 Special Inspections
1.5 QC ORGANIZATION
1.5.1 QC Manager
1.5.1.1 Duties
1.5.1.2 Qualifications
1.5.2 Lead Commissioning Specialist (CxC)
1.5.3 Construction Quality Management Training
1.5.4 Alternate QC Manager Duties and Qualifications
1.5.5 Assistant QC Manager Duties and Qualifications
1.5.6 QC Specialists Duties and Qualifications
1.5.7 Special Inspector [Special Inspector of Record]
1.5.8 Registered Fire Protection Engineer
1.5.9 Submittal Reviewer[s] Duties and Qualifications
1.5.10 Underwater QC Team
1.5.11 QC for [Secure Space][Controlled Area][Sound Rated] Perimeter
Construction
1.5.11.1 Periodic (Follow-Up Phase) Inspections
1.5.11.2 Preliminary Inspection
1.5.11.3 Acceptance Testing for Sound Attenuation
1.5.11.4 Acceptance Testing for Electronic Security Systems
1.5.11.5 Final Inspection
1.6 QUALITY CONTROL (QC) PLAN
1.6.1 Construction Quality Control (QC) Plan
1.6.1.1 Requirements
SECTION 01 45 00.00 20 Page 1