USACE / NAVFAC / AFCEC / NASA UFGS-02 54 23 (February 2010)
Change 1 - 08/17
------------------------------------
Preparing Activity: USACE Superseding
UFGS-02 54 23 (
April 2006)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 54 23
SOIL WASHING THROUGH SEPARATION/SOLUBILIZATION
02/10, CHG 1: 08/17
PART 1 GENERAL
1.1 MEASUREMENT AND PAYMENT
1.1.1 Measurement
1.1.2 Payment
1.1.2.1 Treatability Studies
1.1.2.2 Demonstration Test Run
1.1.2.3 Feed Oversize Materials Treatment and/or Disposal
1.1.2.4 Feed Materials Treatment
1.1.2.5 Other Work Items
1.1.3 Excess Quantity
1.1.4 Reprocessing
1.2 REFERENCES
1.3 SYSTEM DESCRIPTION
1.3.1 Soil Washing Treatment Process
1.3.2 Soil Washing Treatment Plant
1.3.2.1 Soil Preparation and Feed System
1.3.2.2 Soil Washing and Separation System
1.3.2.3 Spent Washwater Treatment System
1.3.2.4 Plant Supporting System
1.3.3 Performance Requirements
1.3.4 Cut Size Requirement
1.3.5 Installation Requirements
1.3.6 Results of Previously Conducted Treatability Studies
1.3.7 Utilities
1.3.8 Spent Washwater Treatment and Disposal Requirements
1.3.9 Solid Waste Treatment and Disposal Requirements
1.3.10 Emissions and Dust Control
1.3.11 Noise Control
1.3.12 Sampling, Monitoring, and Control Requirements
1.3.13 Contaminated Material Measurement Accuracy Requirements
1.3.14 Mobilization
1.3.15 Demobilization
1.3.16 Submittal Requirements
SECTION 02 54 23 Page 1