**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-07 81 00 (February 2011)
------------------------------------
Preparing Activity: USACE Superseding
UFGS-07 81 00 (
November 2010)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 81 00
SPRAY-APPLIED FIREPROOFING
02/11
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.2.1 General Requirements
1.2.2 Fire Resistance Rating
1.2.3 Evaluation Reports - ICC-ES Reports
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Installer Qualifications
1.4.2 Pre-Installation Meeting
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 PROJECT/SITE CONDITIONS
1.6.1 Temperature
1.6.2 Ventilation
PART 2 PRODUCTS
2.1 SPRAY-APPLIED FIREPROOFING
2.1.1 Dry Density and Cohesion/Adhesion
2.1.1.1 Concealed Structural Components
2.1.1.2 Exposed Structural Components
2.1.1.3 Mechanical Rooms and Storage Areas
2.1.2 Deflection
2.1.3 Bond-Impact
2.1.4 Compressive Strength
2.1.5 Corrosion
2.1.6 Air Erosion
2.2 SEALER
2.3 WATER
2.4 SPRAY-APPLIED INTUMESCENT EPOXY COATING SYSTEM
2.4.1 Percent Solids by Weight
2.4.2 In Service Temperature Restrictions
2.4.3 Application Method
SECTION 07 81 00 Page 1