USACE / NAVFAC / AFCEC / NASA UFGS-33 01 98 (May 2013)
------------------------------------
Preparing Activity: USACE New
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 33 - UTILITIES
SECTION 33 01 98
SLIP LINING OF EXISTING PIPING FOR LEVEE APPLICATIONS
05/13
PART 1 GENERAL
1.1 SUMMARY
1.2 MEASUREMENT AND PAYMENT
1.3 REFERENCES
1.4 ADMINISTRATIVE REQUIREMENTS
1.4.1 Pre-Installation Conference
1.4.2 Detailed Work Plan
1.4.3 Sequencing and Scheduling
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.6.1 Qualifications and Supervision
1.6.2 Grout Contractor Qualifications
1.7 DELIVERY, STORAGE, AND HANDLING
1.8 WARRANTY
PART 2 MATERIALS
2.1 DESIGN REQUIREMENTS
2.1.1 Conveyance Capacity
2.1.2 Downstream Scour Protection
2.1.3 Design Criteria
2.1.4 Analysis and Calculations
2.2 LINER PIPE
2.2.1 PVC Pipe(Machine Spiral Wound)
2.2.1.1 Profile Strip
2.2.1.2 Joints
2.2.2 Solid-Wall High Density Polyethylene Pipe (HDPE)
2.2.2.1 Pipe
2.2.2.2 Joints
2.2.3 Glass Fiber-Reinforced Plastic Pipe
2.2.3.1 Pipe
2.2.3.2 Joints
2.2.4 UV Protective End Treatment
SECTION 33 01 98 Page 1