USACE / NAVFAC / AFCEC / NASA UFGS-40 05 13 (October 2007)
Change 2 - 02/20
------------------------------------
Preparing Activity: USACE Superseding
UFGS-40 05 13 (April 2006)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 40 - PROCESS INTERCONNECTIONS
SECTION 40 05 13
PIPELINES, LIQUID PROCESS PIPING
10/07, CHG 2: 02/20
PART 1 GENERAL
1.1 UNIT PRICES
1.1.1 Measurement
1.1.2 Payment
1.1.2.1 Connections to Existing Piping
1.1.2.2 Connections to Existing Equipment
1.2 REFERENCES
1.3 SUBMITTALS
1.4 QUALIFICATIONS
1.4.1 Experience
1.4.2 Double Containment Piping System Manufacturer
1.4.3 Welders
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 PROJECT/SITE CONDITIONS
1.6.1 Environmental Requirements
1.6.2 Existing Conditions
1.7 SEQUENCING AND SCHEDULING
1.8 MAINTENANCE
1.8.1 Service
1.8.2 Extra Materials
PART 2 PRODUCTS
2.1 SYSTEM REQUIREMENTS
2.1.1 Design Requirements
2.1.2 Performance Requirements
2.1.2.1 Buried Piping Systems
2.1.2.2 Above Grade Piping Systems
2.2 MATERIALS AND EQUIPMENT
2.2.1 Standard Products
2.2.2 Identification and Tagging
2.3 DUCTILE IRON PIPING SYSTEM
2.3.1 Ductile Iron Pipe
SECTION 40 05 13 Page 1