BY ORDER OF THE AIR FORCE TACTICS, TECHNIQUES,
SECRETARY OF THE AIR FORCE AND PROCEDURES 3-32.34V5
28 February 2017
Tactical Doctrine
CONTINGENCY ELECTRICAL POWER
PRODUCTION AND DISTRIBUTION SYSTEMS
ACCESSIBILITY: Publications and forms are available on the e-Publishing
website at www.e-publishing.af.mil
for downloading or ordering.
RELEASABILITY: No releasability restrictions on this publication.
OPR: AFCEC/CXX
Certified By: AF/A4C
Supersedes: AFH 10-222V5, (Maj Gen Timothy S. Green)
1 July 2008 Pages: 61
PURPOSE: This publication supports Air Force Instruction (AFI) 10-209, Red
Horse Program and AFI 10-210, Prime Base Engineer Emergency Force (BEEF)
Program. It provides tactics, techniques, and procedures (TTP) that address
actions helpful when installing Basic Expeditionary Airfield Resources (BEAR)
contingency electrical generation and distribution systems.
APPLICATION: This publication applies to active duty Air Force, Air National
Guard (ANG), and Air Force Reserve Command (AFRC) Civil Engineer
personnel. The electrical and power production technicians using this TTP should
have a basic knowledge of electrical components of the contingency systems. This
TTP provides additional guidance by augmenting applicable electrical power
production distribution systems technical orders (TOs); TOs remain the final
authority. Refer to the applicable system TO for detailed installation, operation,
maintenance, and removal procedures. Readiness and deployment planners and
base level mobility team chiefs responsible for contingency planning may also find
this information helpful regarding bare base electrical generation and distribution
planning. This publication may also be used in support of peacetime contingencies.
Other users of this TTP should be familiar with basic contingency electrical
components.