DD-FORM-1921-2进度-服务器报告(2007年4月)-[ADOBE-PDF-TEMPLATE

ID:40171

大小:0.59 MB

页数:1页

时间:2023-03-14

金币:20

上传者:战必胜
A2
SECURITY CLASSIFICATION
PROGRESS CURVE REPORT
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 16 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a
collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PROGRAM
a. MDAP:
b. PHASE:
2. PRIME MISSION PRODUCT 3. CONTRACTOR TYPE (X one)
PRIME/ASSOCIATE
DIRECT-REPORTING SUBCONTRACTOR
4. NAME/ADDRESS (Include ZIP Code)
5. APPROVED PLAN NUMBER 6. CUSTOMER (Direct-Reporting Subcontractor Use Only) 7. TYPE ACTION
a. CONTRACT NO.:
c. LATEST MODIFICATION:
b. SOLICITATION NO.:
d. NAME:
8. PERIOD OF PERFORMANCE
a. START DATE (YYYYMMDD): b. END DATE (YYYYMMDD):
21. APPROPRIATION
RDT&E
9. REPORT CYCLE (X one)
INITIAL
10. SUBMISSION NUMBER 11. RESUBMISSION NUMBER 12. REPORT AS OF (YYYYMMDD)
13. NAME (Last, First, Middle Initial) 14. DEPARTMENT 15. TELEPHONE NUMBER (Include Area Code) 16. EMAIL ADDRESS 17. DATE PREPARED (YYYYMMDD)
18. WBS ELEMENT CODE 19. WBS REPORTING ELEMENT 20. UNITS/LOTS COMPLETED
A. COMPLETED UNITS/LOTS
A1 A3
B. WORK IN PROCESS
(WIP)
A4
C. TOTAL DIRECT COSTS AND
HOURS INCURRED TO DATE
DD FORM 1921-2, APR 2007
PREVIOUS EDITION IS OBSOLETE.
SECURITY CLASSIFICATION
Adobe Professional 7.0
UNIT TOTAL LOT TOTAL
DATA ELEMENTS
INTERIM
PROCUREMENT
(1)
MODEL AND SERIES
(2) FIRST UNIT
(3) LAST UNIT
(4) CONCURRENT UNITS
CHARACTERISTICS
(8) DIRECT TOOLING LABOR HOURS
(9) DIRECT TOOLING LABOR DOLLARS
(10) DIRECT TOOLING & EQUIPMENT DOLLARS
(11) DIRECT QUALITY CONTROL LABOR HOURS
(12) DIRECT QUALITY CONTROL LABOR DOLLARS
(13) DIRECT MANUFACTURING LABOR HOURS
(14) DIRECT MANUFACTURING LABOR DOLLARS
(15) TOTAL DIRECT MANUFACTURING OPERATIONS DOLLARS (Sum of rows 9, 10, 12, and 14)
MATERIALS (Recurring Only)
(16) RAW MATERIAL DOLLARS
(17) PURCHASED PARTS DOLLARS
(18) PURCHASED EQUIPMENT DOLLARS
(19) TOTAL DIRECT-REPORTING SUBCONTRACTOR DOLLARS
(20) TOTAL DIRECT MATERIAL DOLLARS
OTHER COSTS (Recurring Only)
(21) OTHER DIRECT COSTS NOT SHOWN ELSEWHERE (Specify in Remarks)
SUMMARY (Recurring Only)
(22) TOTAL DIRECT COST
O&M
MANUFACTURING OPERATIONS (Recurring Only)
(5a)
(5b)
(5c)
FINAL
ENGINEERING (Recurring Only)
(6) DIRECT ENGINEERING LABOR HOURS
(7) DIRECT ENGINEERING LABOR DOLLARS
23. REMARKS
Downloaded from http://www.everyspec.com
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭