REPORT DOCUMENTATION PAGE
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection
of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information on Operations and Reports (0704-
0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to
any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. REPORT DATE (DD-MM-YYYY)
11-03-2015
2. REPORT TYPE
Final
3. DATES COVERED (From - To)
4. TITLE AND SUBTITLE
Joint Ordnance Test Procedure (JOTP)-053
Electrical Stress Test (EST)
5a. CONTRACT NUMBER
5b. GRANT NUMBER
5c. PROGRAM ELEMENT NUMBER
6. AUTHORS
5d. PROJECT NUMBER
5e. TASK NUMBER
5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES)
Fuze and Precision Armaments Technology Directorate
U.S. Army Armament Research, Development and Engineering Center
ATTN: RDAR-MEF-F
Picatinny Arsenal, NJ 07806-5000
8. PERFORMING ORGANIZATION
REPORT NUMBER
JOTP-053
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES)
Range Infrastructure Division (CSTE-TM)
US Army Test and Evaluation Command
2202 Aberdeen Boulevard
Aberdeen Proving Ground, MD 21005-5001
10. SPONSOR/MONITOR’S
ACRONYM(S)
11. SPONSOR/MONITOR’S REPORT
NUMBER(S)
Same as item 8
12. DISTRIBUTION/AVAILABILITY STATEMENT
Distribution Statement A. Approved for public release; distribution is unlimited.
13. SUPPLEMENTARY NOTES
Defense Technical Information Center (DTIC), AD No.:
14. ABSTRACT
This document has been developed to address electrical stress tests for use in the evaluation of weapon system fuzes
and fuze components. The primary purpose of the test guideline is to standardize various credible stressing electrical
stimuli to determine a level of electrical ruggedness of the safety system.
15. SUBJECT TERMS
Electrical Stress Test ESADS Complex Logic Device
16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF
ABSTRACT
SAR
18. NUMBER
OF
PAGES
14
19a. NAME OF RESPONSIBLE PERSON
a. REPORT B. ABSTRACT C. THIS PAGE
Unclassified Unclassified Unclassified
19b. TELEPHONE NUMBER (include area code)
Standard Form 298 (Rev. 8-98)
Prescribed by ANSI Std. Z39-18
Downloaded from http://www.everyspec.com