Standard Form 298 (Rev. 8-98)
Prescribed by ANSI Std. Z39-18
REPORT DOCUMENTATION PAGE
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information on Operations and
Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person
shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. REPORT DATE (DD-MM-YYYY)
21-09-2009
2. REPORT TYPE
3. DATES COVERED (From - To)
Test Operations Procedure (TOP)
1-2-511 Electromagnetic Environmental Effects System Testing
5c. PROGRAM ELEMENT NUMBER
6. AUTHORS
5d. PROJECT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES)
Survivability, Vulnerability & Assessment Directorate (TEDT-WSV-E)
US Army White Sands Missile Range
White Sands Missile Range, NM 88002-5178
8. PERFORMING ORGANIZATION
REPORT NUMBER
TOP 1-2-511
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES)
Test Business Management Division (TEDT-TMB)
US Army Developmental Test Command
314 Longs Corner Road
Aberdeen Proving Ground, MD 21005-5055
10. SPONSOR/MONITOR’S
ACRONYM(S)
11. SPONSOR/MONITOR’S REPORT
NUMBER(S)
Same as item 8
12. DISTRIBUTION/AVAILABILITY STATEMENT
Approved for public release, distibution unlimited.
13. SUPPLEMENTARY NOTES
Defense Technical Information Center (DTIC), AD No.: ADA506300
This TOP supersedes TOP 1-2-511, dated 29 December 1989, TOP 1-2-512 Electromagnetic Compatibility Tests
dated 15 May 1995 and TOP 6-2-560 Compatibility, Electromagnetic dates 12 October 1979.
This Test Operational Procedure (TOP) provides the Electromagnetic Environmental Effects (E3) interface
requirements and verification criteria for airborne, sea, space, and ground systems, including associated ordnance,
as stated in military standard (MIL-STD)-464A “Electromagnetic Environmental Effects Requirement for Systems”,
as well as ADS-37A-PRF “Aeronautical Design Standard for the Electromagnetic Environmental Effects (E3)
Performance and Verification Requirements”.
Electromagnetic Effects HERO Lightning Electromagnetic Pulse
Electrostatic Discharge TEMPEST High Power Microwave
16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF
ABSTRACT
SAR
18. NUMBER
OF
PAGES
169
19a. NAME OF RESPONSIBLE PERSON
Uncl Uncl Uncl
19b. TELEPHONE NUMBER (include area code)
Downloaded from http://www.everyspec.com