TOP-7-3-057测试操作程序皮托静态系统校准(2008年4月10日)

ID:41407

大小:1.65 MB

页数:70页

时间:2023-03-15

金币:20

上传者:战必胜
Form Approved
REPORT DOCUMENTATION PAGE
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information on Operations and Reports (0704-
0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to
any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. REPORT DATE (DD-MM-YYYY) 2. REPORT TYPE
FINAL
3. DATES COVERED (From - To)
10-04-2008
5a. CONTRACT NUMBER
5b. GRANT NUMBER
4. TITLE AND SUBTITLE
Test Operations Procedure (TOP) 7-3-057
Standard Form 298 (Rev. 8-98)
Prescribed by ANSI Std. Z39-18
Pitot-Static System Calibrations
5c. PROGRAM ELEMENT NUMBER
5d. PROJECT NUMBER
6. AUTHORS
5e. TASK NUMBER
5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION
U.S. Army Aviation Technical Test Center (TEDT-AC-CO)
REPORT NUMBER
Building 30601, Peters Street, Cairns Army Airfield
Fort Rucker, AL 36362-5276
TOP 7-3-057
10. SPONSOR/MONITOR’S ACRONYM(S)
U.S. Army Aviation Technical Test
Center
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES)
Test Business Management Division (TEDT-TMB)
US Army Development Test Command
314 Longs Corner Road
Aberdeen Proving Ground, MD 21005-5055
11. SPONSOR/MONITOR’S REPORT
NUMBER(S)
Same as item 8
12. DISTRIBUTION/AVAILABILITY STATEMENT
Approved for public release, distribution unlimited.
13. SUPPLEMENTARY NOTES
Defense Technical Information Center (DTIC), AD No.:
14. ABSTRACT
This Test Operations Procedure (TOP) describes the test requirements, objectives, responsibilities, and
techniques/methodologies required to perform pitot-static system calibrations. This TOP is used for rotary-wing and
fixed-wing aircraft. The TOP will facilitate test planning, execution, and data collection using two techniques (trailing
device and pace) and the equipment required to complete pitot-static system calibrations. Variations in platform
requirements are discussed within this TOP. These guidelines, along with platform specific capabilities and requirements,
will enable the tester to develop a comprehensive testing strategy.
15. SUBJECT TERMS
Rotary-Wing Aircraft
Fixed Wing Aircraft
Airspeed Calibration
Pitot-Static Calibration
16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF
a. REPORT B. ABSTRACT C. THIS PAGE
19a. NAME OF RESPONSIBLE PERSON
ABSTRACT
SAR
18. NUMBER
OF
PAGES
26
Uncl Uncl Uncl
19b. TELEPHONE NUMBER (include area code)
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭