F C 2791 联邦规范 冷却塔液体(1991年11月29日)[用A 59223替代MIL C 16273F]

ID:41889

大小:1.16 MB

页数:36页

时间:2023-03-16

金币:20

上传者:战必胜
[ INCH-POUND I
FEDERAL SPECIFICATION
F-C-2791
November 29, 1991
SUPERSEDING
MIL-C-16278G(YD)
23 February 1983
COOLING TOWERS, LIQUID
This specification is approved by the Commissioner, Federal
supply-
of all
1. SCOPE
1.1 Stove.
Senice, General Services Administration, for the use
Federal agencies.
This specification covers factory assembled, induced
mechanical draft and forced mechanical draft
industrial use.
1.2 Classification.
The towers shall be
specified (see 6.1.1 and 6.2).
cooling towers for commercial and
of the following types, as
Type I
- Induced mechanical draft
Type II -
Forced mechanical draft
2.
APPLICABLE DOCUMENTS
2.1 Government documents,
2.1.1 Specifications and standards.
The following specifications and
standards, form a part of this document to the extent specified herein. Unless
otherwise specified (see 6.2), the issues of these documents are those listed in
the issue of the Department of Defense Index of Specifications and Standards
(DODISS) and supplement thereto, cited in the solicitation.
lBeneficial comments (recommendations, additions,
deletions) and any pertinent
Idata which may be of use in improving this document should be addressed to: I
#Commanding Officer (Code 156), Naval Construction Battalion Center, Port I
lHueneme, CA 93043-5000, by using the self-addressed Standardization
I
lDocument Improvement Proposal (DD Form 1426) appearing at the end of this I
Idocument or bv letter.
I
FSC 4130
DISTRIBUTION STATEMENT A. Approved for public release; distribution is
unlimited.
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭