DATA ITEM DESCRIPTION
Title: Reliability Test Reports
Number: DI-TMSS-81586 Approval Date: 5 October 2000
AMSC Number: G7401 Limitation: N/A
DTIC Applicable: N/A GIDEP Applicable: No
Office of Primary Responsibility: G/Y243
Applicable Forms: N/A
Use/relationship:
These reports are formal records of the results of the contractor's
reliability tests and will be used by the procuring activity to evaluate
the degree to which the reliability requirements have been met. The
reports shall be periodic test summary reports (see 3.1 below) or Final
Test Reports (see 3.2 below) as reflected in the contract. These reports
may be used to report the results of reliability tests or tests from
which reliability evaluation is a by-product.
Requirements:
1. Reference documents: None
2. Format: Contractor format is authorized.
3. Content: The Reliability Test Reports shall contain the results of
each test or other action taken to demonstrate the level of reliability
achieved in the contract end item and its constituent elements required
by the contract. The reports shall specifically contain the following:
a. Test article identification and full description of test specimens
utilized, including any deviations from the configuration specified in
the applicable test plan.
b. Date and location of test or evaluation.
c. Statement of test/evaluation objectives, including type, unit of
measure, and quantitative goals/requirements to be demonstrated.
d. Statistical confidence calculations, if appropriate.
e. Discussion of methods and conditions of the demonstration,
including test plan used, environmental levels, test profile, methods of
evaluating the data obtained and comparison of the conditions with those
anticipated in ultimate deployment and use of contract item.
f. Results obtained, including specific identification and discussion
of objectives demonstrated satisfactorily and those not demonstrated
satisfactorily.
g. Corrective action anticipated, if applicable.
h. Contractor's conclusion and recommendations based on evaluation of
the test/demonstration results.
i. Requirements for and results of retest in cases where a reject
decision were reached.
3.1 Summary reports. Periodic Test Summary Reports shall consist of
summaries of the progress or status of various reliability tests
underway during the reporting period. All periodic summaries shall
include the following:
Page 1 of 2 Pagees
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭