DefenseAcquisitionLifeCycleComplianceBaseline(Pre‐Tailoring)
Acquisition&ProcurementMilestones,PhasesandDecisionPoints
Thesedecisionpoints,milestonesandphasesarestandardelementsoftheDefenseAcquisitionSystem;however,MDAs,withPMinput,havefulllatitudetotailorprogramsinthemosteffectiveandefficientstructurepossible,unlessconstrainedbystatute
B
Source
Selection
ContractAward
forEMDPhase
TechnologyMaturation&RiskReduction
(TMRR)Phase
Engineering&ManufacturingDevelopment
(EMD)Phase
MaterielSolutionAnalysis
(MSA)Phase
A
Source
Selection
ContractAwards
forTMRRPhase
PDRBeforeorAfterDRFPRD
PDR PDR
ThischartillustratesDoDI5000.02,
HybridProgramModelA(HardwareDominant);tailoring
toindividualprogramcircumstancesisencouraged.
AcquisitionofServicesiscoveredbyDoDI5000.74
IOC
C
Low‐RateInitialProduction/
LimitedRelease
Sustainment
Production&Deployment
(P&D)Phase
Disposal
CDR
MDAApproved
MDD
CDD‐V
Ver.1.2,January31,2018
AoAStudyGuidance
AoAStudyPlan
DCAPE
FullRate
Production/Deployment
DRFPRD
FOC
FRPDR
Operations&Support
(O&S)Phase
Financial
Management
Program
Oversight
&Review
Major
Products
Systems
Engineering
Logistics/
Sustainment
JointCapabilities
Integrationand
Development
System(JCIDS)
ACAT– AcquisitionCategory
AoA– AnalysisofAlternatives
APB– AcquisitionProgramBaseline
ASR– AlternativeSystemsReview
CARD– CostAnalysisRequirements
Description
CCE– ComponentCostEstimate
CCP‐ ComponentCostPosition
CDD– CapabilityDevelopmentDocument
CDD–V– CapabilityDevelopmentDocument
Validation
CDR– CriticalDesignReview
CI‐ Counterintelligence
CIPs– CriticalIntelligenceParameters
CONOPS/OM/MSP Conceptof
Operations/OperationalMode
Summary/MissionProfile
CPD– CapabilityProductionDocument
CSB– ConfigurationSteeringBoard
DCAPE– Director,CostAssessment&
ProgramEvaluation
DRFPRD– DevelopmentRequestfor
ProposalsReleaseDecision
DT&E– DevelopmentalTest&Evaluation
DoDI– DepartmentofDefenseInstruction
DOT&E DirectorofOperationalTest&
Evaluation
ECPs– EngineeringChangeProposals
EMD– Engineering&Manufacturing
Development
EOA– EarlyOperationalAssessment
FCA– FunctionalConfigurationAudit
FD– FullDeployment
FOC– FullOperationalCapability
FOT&E Follow‐onOperationalTest&
Evaluation
FRP– Full‐RateProduction
FRP/FD– Full‐RateProduction/Full
DeploymentDecisionReview
FYDP– FutureYearsDefenseProgram
ICD– InitialCapabilitiesDocument
ICE– IndependentCostEstimate
ILA‐ IndependentLogisticsAssessment
IOC– InitialOperationalCapability
IOT&E– InitialOperationalTest&Evaluation
ISR– In‐ServiceReview
JITC– JointInteroperabilityTestCommand
JROC– JointRequirementsOversightCouncil
LCCE– LifeCycleCostEstimate
LCSP– LifeCycleSustainmentPlan
LFT&E– LiveFireTest&Evaluation
LMDP– Life‐CycleMissionDataPlan
LRIP– Low‐RateInitialProduction
MAIS‐ MajorAutomatedInformation
System
MDA– MilestoneDecisionAuthority
MDAP– MajorDefenseAcquisitionProgram
MDCITA‐ Multi‐Discipline
CounterintelligenceThreatAssessment
MDD– MaterielDevelopmentDecision
MS– Milestone
MSA– MaterielSolutionAnalysis
OA– OperationalAssessment
OTRR– OperationalTestReadinessReview
PBL– Performance–BasedLife‐CycleProduct
Support;Performance‐BasedLogistics
PCA– PhysicalConfigurationAudit
PDR– PreliminaryDesignReview
PIR– PostImplementationReview
PM– ProgramManager
PMO– ProgramManagementOffice
PPBE– Planning,Programming,Budgeting&
Execution
PRR– ProductionReadinessReview
RDT&E– Research,Development,Test&
Evaluation
RFP– RequestforProposal
SCRM– SupplyChainRiskManagement
SEP– SystemsEngineeringPlan
SRR– SystemRequirementsReview
SFR– SystemFunctionalReview
SVR– SystemVerificationReview
TEMP– Test&EvaluationMasterPlan
TMRR– TechnologyMaturation&Risk
Reduction
TRA– TechnologyReadinessAssessment
TRR– TestReadinessReview
VOLT– ValidatedOnlineLifecycleThreat
Acronyms &
Abbreviations
Source
Selection
Contractaward(s)
forMSAPhase
AoA
CapabilitiesBasedAssessment
Contracting
ContractAward
forLRIP
Acquisition
Strategy
Source
Selection
Materiel
Solution
Prototypes
Production
Representative
Articles
LRIP
Articles
Full‐Rate
Production
Systems
Software
Build0.1
Build1.1
Build1.3
Build1.2
Build2.1
(*Theactualnumberandtypeof
softwarebuildsduringtheprogram
willdependonsystemtype.)
Build3.1
Build3.2*
ASR
TRA
Statutoryinformationrequirementsare
shownindarkredbolditalics.
Regulatoryandbestpracticeinformation
requirementsareshowninbluebold.
Fora completelistofstatutoryand
regulatoryinformationrequirementssee
Table2ofDoDI5000.02
Testand
Evaluation
SRR SFR
CSB
SVR
PCA
PRR
TEMP
DevelopmentalTestingofPrototypes
EOA
DevelopmentalTesting
OA
IOT&E
DT&E
LFT&E
FOT&E
ILA
ILA
Demonstrate
ProductSupport
ILA
RDT&E
Operations&Maintenance
Procurement
ConfigurationSteering
Board(CSB)meetsat
leastannuallyonce
established
PRR
TRA
ForamoredetailedPPBE
referenceseetheDAU
FinancialManagement
PlatinumCard
TRR
OTRR
TRR
JITCInteroperabilityTesting
ContractAwards
forFRP/FD/Sustainment
Source
Selection
AppropriationTypes
OperationalMode
Summary/
MissionProfile
Competitive
Prototyping
Full
Fundingin
FYDP
Full
Fundingin
FYDP
ShouldCost
Targets
ShouldCost
Targets
ECPs,SustainmentContracts/SoftwareSupportContracts
PIR
PBLImplementationandOptimization
MDAPMDAP/MAIS MDAPMDAP/MAIS MDAP MDAPMDAP/MAIS MDAP
Affordability
Analysis
Affordability
Analysis
Full
Fundingin
FYDP
Affordability
Analysis
MDAPMDAP/MAIS MDAP
Affordability
Analysis
Full
Fundingin
FYDP
Affordability
Analysis
ICD
Draft
CDD
CDD
DOT&E
Report
onIOT&E
LFT&E
Report
LCSP
TMRR
RFP
Milestone&PhaseInformationRequirements
FRP
RFP
Study
Contract
RFP
EMD
RFP
LRIP
RFP
MDD
AuthorizesMSAPhaseEntry
DirectsconductofAoA
DesignatesLeadComponent
DeterminesPhaseofEntry
MilestoneA
ApprovesTMRRPhaseEntry
ApprovesMaterielSolution&
AcquisitionStrategy
ApprovesTMRRRFPrelease&
SourceSelection
MDAPProgramCertification
MSB
ProgramInitiation
ApprovesEMDPhaseEntry
ApprovesAPB &Updated
DRFPRDInformation
MDAPProgramCertification
MSC
Approves Production&
DeploymentPhaseEntry
ApprovesUpdatedAPB &
AcquisitionStrategy
FRPDR
Approvesproceeding
toFullRateProduction
and/orFull
Deployment(FDDR)
DRFPRD
ApprovesAcquisitionStrategy
&EMDRFP Release
Thisreviewisthe critical
decisionpointinaprogram
Lastpointatwhichsignificant
changescanbemadewithout
majordisruption
CDD‐V
Validationoftheprogram
requirementscontainedin
theCDDbythe
requirementsauthority
(JROCforACATI&IA)
TMRRPhaseKeyActivities
CompetitivePrototyping
TechnologyReadinessAssessment(TRA)
PreliminaryDesignReview(PDR)
ValidateCapabilityDevelopmentDocument(CDD)
UpdateAcquisitionStrategy,andOtherInformation
toSupportDRFPRDandMSB
ReleaseRequestforProposal(RFP)andConduct
SourceSelectionsforTMRRandEMD
MSAPhaseKeyActivities
AoA
Cost/PerformanceTrades
AffordabilityAnalysis
RiskAnalysis
DevelopAcquisitionStrategy,and
OtherInformationtoSupportMSA
SelectPM;establishPMO
EMDPhaseKeyActivities
DevelopmentalTesting(DT)
OperationalAssessments(OA)
CriticalDesignReview
UpdateAcquisitionStrategy,APBandOther
InformationtoSupportMSC
ValidateCapabilityProductionDocument(CPD)
ReleaseRFP andConductSourceSelectionfor
LRIP/FRPPrepareforProduction,Fieldingand
Sustainment
P&DPhaseKeyActivities
LRIP
InitialOperationalTest&Evaluation(IOT&E)
FullRateProduction
Deployment
PerformanceBasedLogistics(PBL)Implementation
UpdateIntel/CIProducts
O&SPhaseKeyActivities
OverlapsP&DPhase
FullRateProduction&DeploymentContinue
PBLImplementationContinues
Disposal– DemilitarizationandDisposalatendof
usefullife
UpdateIntel/CIProducts
MDAApproved
MDAApproved
MDAApproved
ShouldCost
Targets
SEP
SEP
Program
Protection
Plan
Draft
Program
Protection
Plan
Program
Protection
Plan
TEMP TEMP
LCSP
Draft
LCSP
LCSP
TEMP
LCSP
Program
Protection
Plan
Program
Protection
Plan
SEP
Acquisition
Strategy
Acquisition
Strategy
Acquisition
Strategy
TEMP
ShouldCost
Targets
Economic
Analysis
(MAIS)
CARD
CCE
CCP
ICE CARD
CCE
CCP
ICE
CARD
CCE
CCP
ICE
Economic
Analysis
(MAIS)
MDAP
CARD
CCE
CCP
ICE
Manpower
Estimate
Economic
Analysis
(MAIS)
Integration
KeyPhase
Activities
Acquisition
Intelligence
VOLT
VOLT
DevelopCIPs
DevelopThreatModules
VOLT
CPD
Cost‐PerformanceAnalysis
andTrades
Integrated
Priority
List
Capabilities
Gap
Assessment
Joint
Intelligence
Estimate
RefineCIPs&ThreatModules
IdentifyIntelligenceMissionData
LMDP
DetermineIntelligence
MissionDataDependencies
LMDP
LMDP
SCRM
VOLT
(IncludesCybersecurity
StrategyAnnex)
LMDP
PostAOA
Review
Endof
ServiceLife
Decision
Defense
Intelligence
ThreatLibrary
RefineCIPs,ThreatModules
andIntelligenceMissionData
RefineCIPs,ThreatModules
andIntelligenceMissionData
RefineRequirements
ForProduction
ReassessCI,Cybersecurity,andSecurityEnvironment
ReassessCI,Cybersecurity,andSecurityEnvironment
ReassessCI,Cybersecurity,and
SecurityEnvironment
SCRM
SCRM
SCRM
UpdateasRequired
UpdateasRequired
UpdateasRequired
UpdateasRequired
MDCITA
MDCITA
MDCITA
MDCITA
UpdateasRequired
emailsuggestions
forimprovement
Draft
SEP
Draft
TEMP
CONOPS/
OMS/
MP
CONOPS/
OMS/
MP
CONOPS/
OMS/
MP
FCA
https://www.dau.mil/tools/t/DAU‐Glossary
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭