UFGS 01 91 00.15 10总建筑调试

ID:30210

大小:0.15 MB

页数:52页

时间:2023-01-15

金币:5

上传者:战必胜
**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-01 91 00.15 10 (May 2019)
Change 3 - 05/22
------------------------------------
Preparing Activity: USACE Superseding
UFGS-01 91 00.1
5 (February 2019)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 91 00.15 10
TOTAL BUILDING COMMISSIONING
05/19, CHG 3: 05/22
PART 1 GENERAL
1.1 SUMMARY
1.2 UNIFIED FACILTIES GUIDE SPECIFICATION REFERENCES
1.3 SYSTEMS TO BE COMMISSIONED
1.4 REFERENCES
1.5 COMMUNICATION WITH THE GOVERNMENT
1.6 SEQUENCING AND SCHEDULING
1.6.1 Sequencing
1.6.2 Project Schedule
1.6.3 Phasing
1.7 SUBMITTALS
1.8 COMMISSIONING FIRM
1.8.1 Lead Commissioning Specialist
1.8.2 Technical Commissioning Specialists
1.8.3 Commissioning Standard
1.9 SUSTAINABILITY THIRD PARTY CERTIFICATION (TPC)
1.10 ISSUES LOG
1.11 CERTIFICATE OF READINESS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 DESIGN PHASE
3.1.1 Design Commissioning Coordination Meeting
3.1.2 Design Phase Commissioning Plan
3.1.3 Design Review
3.2 CONSTRUCTION PHASE
3.2.1 Construction Commissioning Coordination Meeting
3.2.2 Design Phase Commissioning Plan
3.2.3 Construction Phase Commissioning Plan
3.2.3.1 Interim Construction Phase Commissioning Plan
SECTION 01 91 00.15 10 Page 1
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭