USACE / NAVFAC / AFCEC / NASA UFGS-32 13 13.17 (November 2020)
------------------------------------
Preparing Activity: USACE Superseding
UFGS-32 13 16.1
6 (November 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 13 13.17
ROLLER COMPACTED CONCRETE PAVING
11/20
PART 1 GENERAL
1.1 UNIT PRICES
1.1.1 Measurement Procedures
1.1.1.1 Concrete Quantity
1.1.1.1.1 Measurement of Concrete Quantity
1.1.1.1.2 Payment for Concrete Quantity
1.1.1.2 Cement Quantity
1.1.1.2.1 Measurement of Cement Quantity
1.1.1.2.2 Payment for Cement Quantity
1.1.1.3 Pozzolan Quantity
1.1.1.3.1 Measurement of Pozzolan Quantity
1.1.1.3.2 Payment for Pozzolan Quantity
1.1.1.4 Ground Granulated Blast Furnace Slag (GGBFS)
1.1.1.4.1 Measurement of GGBFS Quantity
1.1.1.4.2 Payment for GGBFS Quantity
1.1.1.5 Portland-Pozzolan Cement
1.1.1.5.1 Measurement of Portland-Pozzolan Cement Quantity
1.1.1.5.2 Payment for Portland-Pozzolan Cement
1.1.1.6 RCC Lump Sum Contract
1.1.2 Payment Adjustments
1.1.2.1 General Considerations
1.1.2.2 Percent Payment/Acceptance of Lots
1.1.2.3 Density
1.1.2.3.1 Field Density
1.1.2.3.2 Target Density
1.1.2.3.3 Computed Percent Payment for Density
1.1.2.4 Surface Smoothness
1.1.2.4.1 Smoothness Requirements
1.1.2.4.2 Testing Method
1.1.2.4.3 Payment Adjustment for Smoothness
1.1.2.5 Thickness
1.1.2.6 Surface Texture
1.2 REFERENCES
SECTION 32 13 13.17 Page 1