DIVISION 02 - EXISTING CONDITIONS
SECTION 02 56 13.16
CLAY WASTE CONTAINMENT
02/21
PART 1 GENERAL
1.1 UNIT PRICES
1.2 REFERENCES
1.3 SUBMITTAL REQUIREMENTS
1.4 SUBMITTALS
PART 2 PRODUCTS
2.1 CLAY
2.2 EQUIPMENT
2.2.1 Compaction Equipment
2.2.2 Scarification Equipment
2.2.3 Steel Wheeled Rollers
2.2.4 Hand Operated Tampers
PART 3 EXECUTION
3.1 BORROW SOURCE ASSESSMENT
3.1.1 Classification Testing
3.1.2 Compaction Testing
3.1.3 Hydraulic Conductivity Testing
3.1.4 Acceptable Zone Development
3.1.5 Chemical Contamination Testing
3.1.6 Commercial Testing Laboratory
3.2 INSTALLATION
3.2.1 Clay Placement
3.2.2 Moisture Control
3.2.3 Compaction
3.2.4 Scarification
3.2.5 Repair of Voids
3.3 CONSTRUCTION TOLERANCES
3.4 CONSTRUCTION TESTS
3.4.1 Clay Material Tests
SECTION 02 56 13.16 Page 1