USACE / NAVFAC / AFCEC / NASA UFGS-02 62 16.13 10 (August 2018)
------------------------------------
Preparing Activity: USACE Superseding
UFGS-02 01 50 (
May 2010)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 62 16.13 10
OPERATION, MAINTENANCE, AND PROCESS MONITORING FOR SOIL VAPOR EXTRACTION
(SVE) SYSTEMS
08/18
PART 1 GENERAL
1.1 UNIT PRICES
1.1.1 Unit Pricing
1.1.2 Training
1.1.3 Disposal and Replacement of Vapor Phase Activated Carbon
1.1.4 Pneumatic Flow Meter Testing
1.1.5 Completion Testing
1.2 REFERENCES
1.3 ADMINISTRATIVE REQUIREMENTS
1.3.1 Chemical Testing
1.3.2 Assistance in Preparing O & M Manuals
1.3.3 Sequencing and Scheduling
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Permits and Licenses
1.5.2 Air Emissions
1.5.3 Noise Control
1.5.4 Operator Qualifications
1.6 PROJECT/SITE CONDITIONS
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Spill Response Materials
PART 3 EXECUTION
3.1 APPLICATION
3.1.1 SVE System Operation
3.1.1.1 Period of Operation
3.1.1.2 Hours of Operation and Reliability
3.1.1.3 Operational Airflow Rates
SECTION 02 62 16.13 10 Page 1