USACE / NAVFAC / AFCEC / NASA UFGS-07 24 00 (May 2011)
Change 4 - 08/18
------------------------------------
Preparing Activity: NAVFAC Superseding
UFGS-07 24 00 (
August 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 24 00
EXTERIOR INSULATION AND FINISH SYSTEMS
05/11, CHG 4: 08/18
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION AND REQUIREMENTS
1.2.1 System Requirements and Tests
1.2.1.1 Water Penetration
1.2.1.2 Wind Load
1.2.1.3 Full scale or intermediate scale fire test
1.2.1.4 Mock-Up Installation of EIFS
1.2.2 Component Requirements and Tests
1.2.2.1 Surface Burning Characteristics
1.2.2.2 Radiant Heat
1.2.2.3 Impact Resistance
1.2.3 Sub-Component Requirements and Tests
1.2.3.1 Abrasion Resistance
1.2.3.2 Accelerated Weathering
1.2.3.3 Mildew Resistance
1.2.3.4 Salt Spray Resistance
1.2.3.5 Water Resistance
1.2.3.6 Absorption-Freeze/Thaw
1.2.3.7 Sample Boards
1.2.4 Moisture Analysis
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Qualifications of EIFS Manufacturer
1.4.2 Qualification of EIFS Installer
1.4.3 Qualification of Sealant Applicator
1.4.4 Qualifications of Third Party Inspector
1.4.5 Insulation Board
1.4.6 Pre-Installation Conference
1.5 DELIVERY AND STORAGE
1.6 ENVIRONMENTAL CONDITIONS
1.7 WARRANTY
SECTION 07 24 00 Page 1