**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-07 41 63 (November 2016)
------------------------------------
Preparing Activity: NASA Superseding
UFGS-07 41 63 (
May 2009)
UNIFIED FACILITIES GUIDE SPECIFICATION
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 41 63
FABRICATED ROOF PANEL ASSEMBLIES
11/16
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 QUALITY CONTROL
1.4.1 Preroofing Conference
1.4.2 Manufacturer's Technical Representative
1.4.3 Qualification of Manufacturer
1.4.4 Qualification of Installation Contractor
1.4.5 Qualifications for Welding
1.4.6 Single-Source
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 PROJECT/SITE CONDITIONS
1.7 WARRANTY
1.7.1 Manufacturer's Finish Warranty
1.7.2 Metal Roof System Installer Warranty
1.7.3 Continuance of Warranty
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Conformance and Compatibility
2.1.2 Performance Requirements
2.1.3 Fire-Resistance
2.1.3.1 Surface-Burning Characteristics
2.1.3.2 Fire-Resistance Ratings
2.2 FABRICATION
2.2.1 Fabrication
2.2.2 Sheet Metal Flashing and Trim
2.2.2.1 Fabrication, General
2.2.2.2 Roof Drainage Sheet Metal Fabrications
2.2.3 Finishes
2.3 COMPONENTS
SECTION 07 41 63 Page 1