**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-07 52 00 (May 2012)
Change 5 - 11/19
------------------------------------
Preparing Activity: NAVFAC Superseding
UFGS-07 52 00 (
November 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 52 00
MODIFIED BITUMINOUS MEMBRANE ROOFING
05/12, CHG 5: 11/19
PART 1 GENERAL
1.1 REFERENCES
1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEM[S]
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Qualification of Manufacturer
1.4.2 Qualification of Applicator
1.4.3 Qualification of Torch Operator
1.4.4 Qualifications of Photovoltaics (PV) Rooftop Applicator
1.4.5 Qualification of Engineer of Record
1.4.6 Fire Resistance
1.4.7 Wind Uplift Resistance
1.4.8 Preroofing Conference
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.2 Storage
1.5.3 Handling
1.6 ENVIRONMENTAL REQUIREMENTS
1.7 [TORCH][HOT-MOPPED ASPHALT] APPLIED [(HEAT WELD)] MODIFIED BITUMEN
MEMBRANE SAFETY
1.7.1 Property Protection
1.7.2 Fire Watch
1.7.3 Open Flame Application (Torch) Equipment and Personnel Safety
1.7.4 Wind Conditions
1.8 SEQUENCING
1.9 WARRANTY
1.9.1 Roof Membrane Manufacturer Warranty
1.9.2 Roofing System Installer Warranty
1.9.3 Continuance of Warranty
1.10 CONFORMANCE AND COMPATIBILITY
1.11 ELIMINATION, PREVENTION OF FALL HAZARDS
1.11.1 Fall Protection
SECTION 07 52 00 Page 1