**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-07 51 13 (May 2012)
Change 2 - 11/18
------------------------------------
Preparing Activity: NAVFAC Superseding
UFGS-07 51 13 (
February 2012)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 51 13
BUILT-UP ASPHALT ROOFING
05/12, CHG 2: 11/18
PART 1 GENERAL
1.1 REFERENCES
1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEM[S]
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Qualifications of Applicator
1.4.2 Qualifications of Photovoltaics (PV) Rooftop Applicator
1.4.3 Fire Resistance
1.4.4 Wind Uplift Resistance
1.4.5 Preroofing Conference
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.2 Storage
1.5.3 Handling
1.6 ENVIRONMENTAL CONDITIONS
1.7 SEQUENCING
1.8 WARRANTY
1.8.1 Roof Membrane Manufacturer Warranty
1.8.2 Roofing System Installer Warranty
1.8.3 Continuance of Warranty
1.9 CONFORMANCE AND COMPATIBILITY
1.10 ELIMINATION, PREVENTION OR CONTROL OF FALL HAZARDS
1.10.1 Fall Protection
PART 2 PRODUCTS
2.1 GENERAL
2.1.1 Energy [and Cool Roof] Performance
2.2 FIBERGLASS FELT MATERIALS
2.3 BASE FLASHING MEMBRANE
2.4 ASPHALT
2.5 SURFACING MATERIAL
2.5.1 Aggregate for Surfacing Built-up Roofing
SECTION 07 51 13 Page 1