**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-07 54 19 (February 2013)
Change 3 - 02/21
------------------------------------
Preparing Activity: USACE Superseding
UFGS-07 54 19 (
November 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 54 19
POLYVINYL-CHLORIDE ROOFING
02/13, CHG 3: 02/21
PART 1 GENERAL
1.1 REFERENCES
1.2 SUMMARY
1.3 ASSEMBLY REQUIREMENTS
1.3.1 Fire Resistance
1.3.2 Wind Uplift Resistance
1.3.3 Solar Reflectance Index (SRI)
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Qualification of Manufacturer
1.5.2 Qualifications of Applicator
1.5.3 Qualifications of Photovoltaics (PV) Rooftop Applicator
1.5.4 Qualification of Engineer of Record
1.5.5 Conformance and Compatibility
1.5.6 Preroofing Conference
1.6 DETAIL DRAWINGS
1.7 DELIVERY, STORAGE, AND HANDLING
1.7.1 Delivery
1.7.2 Storage
1.7.3 Handling
1.8 ENVIRONMENTAL REQUIREMENTS
1.9 SEQUENCING
1.10 WARRANTY
1.10.1 Roof Membrane Manufacturer Warranty
1.10.2 Roofing System Installer Warranty
1.10.3 Continuance of Warranty
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 PVC Roof Membrane
2.1.2 Energy Star
2.1.3 Energy [and Cool Roof] Performance
SECTION 07 54 19 Page 1