USACE / NAVFAC / AFCEC / NASA UFGS-13 49 10 (November 2020)
------------------------------------
Preparing Activity: USACE Superseding
UFGS-13 49 10 (
February 2009)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 13 - SPECIAL CONSTRUCTION
SECTION 13 49 10
X-RAY SHIELDING
11/20
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY CONTROL
1.3.1 Preinstallation Meeting
1.3.2 Shielding Delegated Design
1.3.3 Installer Experience
1.3.4 Source Responsibility
1.4 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 X-RAY SHIELDING SYSTEM
2.2 LEAD SHEET
2.3 LEAD-LINED CONCRETE MASONRY UNITS
2.4 LEAD LINED PLYWOOD
2.5 LEAD-LINED GYPSUM WALLBOARD
2.6 CONCRETE SHIELDING MATERIAL
2.7 INTERLOCKING LEAD BRICKS
2.8 LEAD GLASS
2.9 LEAD-LINED WOOD DOORS
2.9.1 Door Hardware
2.9.2 Thresholds
2.10 LEAD-LINED STEEL DOORS
2.10.1 Door Hardware
2.10.2 Thresholds
2.11 DOOR FRAMES
2.12 WINDOW FRAMES
2.13 LOUVERS
2.14 DESIGNATING PLAQUES
2.14.1 Continuous X-Ray Shielding System
2.14.2 Shielded Partitions
SECTION 13 49 10 Page 1