UFGS 14 92 00气动管道系统

ID:30473

大小:0.05 MB

页数:15页

时间:2023-01-15

金币:5

上传者:战必胜
**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-14 92 00 (February 2009)
Change 1 - 02/15
------------------------------------
Preparing Activity: USACE Superseding
UFGS-14 92 00 (
April 2006)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 14 - CONVEYING EQUIPMENT
SECTION 14 92 00
PNEUMATIC-TUBE SYSTEM
02/09, CHG 1: 02/15
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.2.1 General Requirements
1.2.2 Electrical Work
1.3 SUBMITTALS
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 EXTRA MATTERIALS
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
2.2 ENERGY EFFICIENCY
2.3 CARRIER TUBING
2.3.1 Tubing
2.3.2 Bends
2.3.3 Fittings
2.4 POWER UNITS
2.5 AUTOMATIC CENTRAL-CONTROL CENTER
2.5.1 Operation of the System
2.5.2 Control Program
2.5.3 Computer Circuits and Keyboard
2.5.3.1 Cathode Ray Tube
2.5.3.2 Keyboard
2.5.3.3 Printer
2.5.3.4 Alarm Module
2.6 STORAGE AREAS
2.7 AUTOMATIC SWITCHING EQUIPMENT
2.8 SUBSTATION EQUIPMENT
2.8.1 Receiving Units
2.8.2 Sending Units
2.8.3 Carrier Storage Receptacle
2.8.4 Station Control Panel
SECTION 14 92 00 Page 1
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭