USACE / NAVFAC / AFCEC / NASA UFGS-23 22 23.00 40 (August 2015)
------------------------------------
Preparing Activity: NASA Superseding
UFGS-23 22 23.0
0 40 (February 2011)
UFGS-23 22 23 (August 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
SECTION 23 22 23.00 40
STEAM CONDENSATE PUMPS
08/15
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 Product Installation
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 COMPONENTS
2.2.1 Condensate Return Pump Units
2.2.1.1 Pumps
2.2.1.2 Motor Requirements
2.2.1.3 Receiver
2.2.1.4 Controls
2.2.2 Condensate Receiver
2.2.2.1 Materials and Construction
2.2.2.2 Accessories
2.2.3 Reciprocating Steam Pumps (Rsp)
2.2.3.1 Construction
2.2.3.2 Tools and Accessories
2.2.3.3 Steam-Cylinder Drainage
2.3 TESTS, INSPECTIONS, AND VERIFICATIONS
2.3.1 Factory Tests
PART 3 EXECUTION
3.1 INSTALLATION
3.2 FIELD QUALITY CONTROL
3.2.1 Testing
3.2.1.1 Vibration Analyzer
3.2.1.2 Acceptance Testing
SECTION 23 22 23.00 40 Page 1