**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-23 52 30.02 10 (May 2020)
------------------------------------
Preparing Activity: USACE Superseding without Revision
UFGS-
23 70 02.00 10 (January 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
SECTION 23 52 30.02 10
CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL FIRED
05/20
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SYSTEM DESCRIPTION
1.3.1 Design Analysis and Calculations
1.3.2 Electrical Environment
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Experience
1.5.2 Welding
1.5.3 Use of Asbestos Products
1.5.4 Detail Drawings
1.6 DELIVERY, STORAGE, AND HANDLING
1.7 PROJECT/SITE CONDITIONS
1.8 EXTRA MATERIALS
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
2.1.1 Standard Products
2.1.2 Nameplates
2.1.3 Equipment Guards and Access
2.2 MATERIALS
2.2.1 Brick, Common
2.2.2 Bricks, Refractory
2.2.3 Bricks, Refractory, Insulating
2.2.4 Coal-Tar Primer and Enamel
2.2.5 Draft Gauge
2.2.6 Exhaust Head
2.2.7 Expansion Joint
2.2.8 Gauge, Pressure and Vacuum
2.2.9 Low Water Cutoff
2.2.10 Mortar, Refractory
SECTION 23 52 30.02 10 Page 1