USACE / NAVFAC / AFCEC / NASA UFGS-25 10 10 (February 2019)
Change 1 - 05/21
------------------------------------
Preparing Activity: USACE Superseding
UFGS-25 10 10 (
November 2015)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 25 - INTEGRATED AUTOMATION
SECTION 25 10 10
UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND INTEGRATION
02/19, CHG 1: 05/21
PART 1 GENERAL
1.1 SUMMARY
1.1.1 System Requirements
1.1.1.1 General System Requirements
1.1.1.2 LonWorks Requirements
1.1.1.3 BACnet Requirements
1.1.1.4 Modbus Requirements
1.1.1.5 OPC Requirements
1.1.1.6 Niagara Framework Requirements
1.1.2 Symbols, Definition and Abbreviations
1.1.3 System Units and Accuracy
1.1.4 Data Packages/Submittals Requirements
1.2 RELATED SECTIONS
1.3 REFERENCES
1.4 DEFINITIONS
1.4.1 Alarm Generation
1.4.2 Alarm Handling
1.4.3 Alarm Routing
1.4.4 Application Generic Controller (AGC)(LonWorks)
1.4.5 Application Specific Controller (ASC)(LonWorks)
1.4.6 BACnet (BACnet)
1.4.7 BACnet Advanced Application Controller (B-AAC)(BACnet)
1.4.8 BACnet Advanced Operator Workstation (B-AWS)(BACnet)
1.4.9 BACnet Application Specific Controller (B-ASC)(BACnet)
1.4.10 BACnet Building Controller (B-BC)(BACnet)
1.4.11 BACnet Internetwork (BACnet)
1.4.12 BACnet Interoperability Building Blocks (BIBBs) (BACnet)
1.4.13 BACnet Operator Display (B-OD)(BACnet)
1.4.14 BACnet Operator Workstation (B-OWS)(BACnet)
1.4.15 BACnet Smart Actuator (B-SA)(BACnet)
1.4.16 BACnet Smart Sensor (B-SS)(BACnet)
1.4.17 BACnet Testing Laboratories (BTL)(BACnet)
1.4.18 BACnet Testing Laboratories (BTL) Listed (BACnet)
SECTION 25 10 10 Page 1