**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-31 32 39 (August 2008)
------------------------------------
Preparing Activity: USACE Superseding
UFGS-31 32 39 (
April 2006)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 32 39
BIOENGINEERING PRACTICES FOR STREAM BANK AND SHORELINE STABILIZATION
08/08
PART 1 GENERAL
1.1 SUMMARY
1.2 MEASUREMENT AND PAYMENT
1.2.1 Binder
1.2.2 Live or Dead Cuttings
1.2.3 Materials
1.3 REFERENCES
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Regulatory Compliance
1.5.2 Pre-Installation Conference
1.5.3 Substitutions
1.5.4 Qualifications
1.5.4.1 Installer's Qualification
1.5.4.2 Personnel Qualifications
1.6 DELIVERY, STORAGE, AND HANDLING
1.6.1 Erosion Control Blankets
1.6.2 Seed
1.6.3 Lumber
1.6.4 Vegetation
1.6.5 Earth Materials
1.6.6 Logs, Trunks and Brush
1.7 PROJECT/SITE CONDITIONS
1.7.1 Environmental Requirements
1.7.2 Existing Site Conditions
1.7.3 Site Evaluation Plan
1.8 SEQUENCING AND SCHEDULING
1.9 WARRANTY
1.10 MAINTENANCE
1.10.1 General
1.10.2 Maintenance Instructions
PART 2 PRODUCTS
SECTION 31 32 39 Page 1