DI FNCL 80449 数据项说明 设计成本寿命周期成本和差异分析报告(1987年9月30日)

ID:44126

大小:0.67 MB

页数:8页

时间:2023-03-17

金币:20

上传者:战必胜
‘o
\
(i
(
ksiqn-to-Cost/Lxfe Cycle Cost -4 Variance
I
LU-YNCL-60449
Analycis &port
oUrw’loNlwmmt
L1 Swert cmveys to TM government * -tractor Dmivn-emt lDIC)/~fe IWCIG
~st (XC) estamaces. ffrr dafa UIll br used rs
valtuts mid establish demign-tc.-unlt
pmductim
cost nd
L
ife C
y
cle Cost (
L
ccl
w
a
1
*
I Wasure contractor
w
rfor=ance
to
w
ard
w
etig
t sUb limhed o2C md 24
X
9-1s; identify and record OK/L.CC probl~~;
end
provide tLEIY; relmble USC mf ornaum for use in v.tlmtinq proposed design,
&
siqn-to-test, nd UC chumm.
A
PmD
v
u Mu
s. WKS of mlMu
Y
ROmusml mr k
w
sl
bn
G
losm
A
??
L
K4
~)
870930
-UCAIION nwmsslAnoMsntP
7.1 mi~ data xmm dearriptam cantainm rlw
farmmt md cmtent Preptraum
imtrwtims far thr data prdrret gmeramd by * spcific and discrenr task
-Wi=-t s delinmmd m the omtmrt.
7.2 mme reparr.s
rc ppltcabie for me m emwwetr of my size when * mit
production and/or Opmatima 1 tpprt cmu re m important criteria in thc CDSf
f f ecu wmesc of tbr Ueam 9ycaa. *m mpmfx em br required t varienr leve 16
of deteil depmdinq on the potential dollar avmgs to tbe GC.vrmmtnt m relation to
tku?
cost of data callectian and UI
A
1
Y
S
A
8.
lCan
?
A
n
w
d m Page 2)
U
?
ROM
A
LUITAIION
ls&UwasUrom4s
I* AMscNIJMSCR
I
I
F4223
%
?
m
!
m
%
w
.
%
rlxtlell.. fbe
pplicable i-me of thr derurmi- ciwd lNrOMh
ticluding their meval dates and data= of m
y
W
@
imble m
w
Id
w
Mts. IIOU=B, =Dd
relmum, shall be as sprelf$ed m the cont ract.
1
0.2 Cmtmt. me
Design-ti-Cost/Life Cyrle Cost and
V
ariance
A
nal
Y
sil R8p0rt shall
include the
fel lmnng seetims:
10.2.1 Eecutive S-ry. T+Kexecutive sum?ary dull br liruted w me Pnge,
briefly deserlbang the program and sratxIg the resulw and CmCluSimS of UaRreprt.
10.2.2 Table of tumtentc, Li@t of YiVUM s and
L
i8t of Mles.
I&z.3 fnmxfuccim. Brief demriptim
of
@
m map WS?m in t=ms of scbedml e
@
u*e, program requirmen u, et.=.
10.2.4 Grmnt drulec and Ass!xn!ptims. zM8 ctim 9!u11 tisrrike key .nmptiIxIs
ude an the
cmtmg of the SYS- mcludmq quantities, schedule produeum rams,
mute of
technology, program b- ymI, infla-cm mtes, bmdume md f Wsre
confzgU?#tiM. Alm listed hal 1 kc:
(1) item tbm
re not included in tbr
estimate, such
s Oovermmt Pumiished ymn~nt (OYSI m othar xtemr that make up
the umpm Bystem but
re not mder thr cmtmctors omtml and (2) Ccrmral and
Muna#UaUve (GsA) and fee r-rccntage.s.
(Cmtimed m Paw 2)
1 OIWWSUIUI
$1ATSMtN7
I
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭