DI MFFP 81403B 数据项说明(DID)腐蚀预防和控制计划(CPCP)(2020年3月31日)

ID:44376

大小:0.13 MB

页数:8页

时间:2023-03-17

金币:20

上传者:战必胜
DATA ITEM DESCRIPTION
Title: CORROSION PREVENTION AND CONTROL PLAN (CPCP)
Number: DI-MFFP-81403B Approved Date: 20200331
AMSC Number: N10166 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: AS Project Number: MFFP-2020-004
Applicable Forms: N/A
Use/Relationship: The Corrosion Prevention and Control Plan (CPCP) is applicable to any system
acquisition that includes a requirement for a corrosion prevention and control program and shall
be used for the entire system and all major subsystems including airframe, avionics, engine, launch
and recovery systems, mechanical subsystems and support equipment.
This Data Item Description (DID) contains the format, content and intended use information for
the data deliverable resulting from the technical requirements described in the latest version of
MIL-STD-1568, Materials and Processes for Corrosion Prevention and Control in Aerospace
Weapons Systems, MIL-STD-1587, Material and Process Requirements for Aerospace Weapons
Systems, and MIL-STD-1530, Aircraft Structural Integrity Program. (Copies of all these
documents are available online at https://quicksearch.dla.mil).
This DID supersedes DI-MFFP-81403A.
Requirements:
1.
Reference Documents. The applicable issue of the documents cited herein, including their
approval dates and dates of any applicable amendments, notices, and revisions, shall be as
specified in the contract.
2.
Format. The CPCP shall be in the contractor’s format.
3.
Content. The specific approaches used for corrosion prevention and control (CPC) of the
system shall be documented utilizing the requirements in the latest version of MIL-STD-1587.
Additional guidance for CPC can be found in the Department of Defense (DOD) Corrosion
Prevention and Control Planning Guidebook for Military Systems and Equipment. (Copies of
the above documents are available online at https://quicksearch.dla.mil).
3.1.
Management considerations: Identify the contractor’s office of primary responsibility,
including relationship to the organization and authority with respect to drawing release and
material and process selections.
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭