Fonm APPMVad
OMB No. 0704-0188
DATA ITEM DESCRIPTION
-w=-a-lm=4bu-. d*
-b9@bmMtonnm1!0 tm8pmqxmbbmMho0w hmluWkn3W.bm
~EIOtintdUJ8Cd~ mdmiWbWti KdUUMdHYTMiYL ~—
-@$w-@s-c=f=htm
mwdi9e+l~E#kKmcaatm—
fW=dbWti__U=IY@U-Ped* @-JCcId~kIf&dM
~=@-_~~~-ti~,-~-O-LVA?=-ti
1. m
2.
IDENTIFICATION NUMBER
MATERIAL
IMPROVEMENT PROJE~ REPORT
DI-MGMT-S0258A
3. DESCRIPTIOWPURPOSE
This information is used by
program management activity to resolve problems impeding deployment and defiiient utilization of mission
9quipment. II also providas investigation results and problems anaty5is IsScessav tor tie Correction of thosa @#iiiencies idemi%d by the
rmcwring activity.
$. APPROVAL DATE
5. OFFICE OF PRIMARY RESPONSIEILtTY (OPR)
O-a.DTIC APPLICABLE
eb. GIDEP APPLlCAJ3LE
F/AFMC/ENBP
970211
1.
APPLICATION/ INTERRELATIONSHIP
7.1 Thii Data Item Description (OID) contains the format and content preparation inslnmtions Ior the data product generatad by the
WSCifiC and discrete
taSkS rsquiremenl for this data included in !he contract,
7.2 Thii DID is applicable to all comracts to acquire Material Improvement Project (MIP) data resulting fmm government directed
nvest igations.
7.3 Thii DID interrelates with , and supercedas 01. MGMT-S025a.
1.APPROVAL UMITATION
9a. APPLICAaLE FORMS 9b. AMSC NUMSER
F7240
10. PREPARATION INSTRUCTIONS
10.1 ~ti This data
item description is genarated by the contrsct which mntains a specific and discrete work tsak to develop this
jata product.
10.2 co ntent and Forma~ Reports shall include
a. MIP numb%r
b. Service Report (SR) number
c. SR Originator
d. Mission, Design, and SerieslNomenclature
e. Model, Equipment. Support Equipment, Trainer Designation
f. Patl number of deficient itam
g. Seriat Number (if applicable)
h. National Stock Number of de ficiem item
1. Work Unit Code of deficient item
j. Problem description
k Investigation results end problem analysis 10 include, as appliibhx
(1) Visual Inspection results
(2) Bench tast rasults
(3) Source of Iailure (isolated to subassembly)
(4) Failure mcde of the subasaembty
L Conclusion - analysis of evenla that led to the S@emalequipment failure (Le., manufacturing pmcesslpmceduras,
materials, test and inspection disciplines).
m. Corrective action or mcommendsd follow-on action shall include
(1) Camponent Improvement Pmgmm tasks
(2) Engineering change proposal number
(3) Class II change number
(4) Technical Ordar ravision
n. Exhibit dmpasition
11,
DISTRIBUTION STATEMENT
DISTRIBUTION STATEMENT A: Approved for public release distribution is unlimited.
------ ---- .- - . ,.. -.. . .-
LSD FOrITI 1554, AF’H MY
rrevtous eamons are oosolete
wage 101 1 rages
Downloaded from http://www.everyspec.com