DATA ITEM DESCRIPTION
Title: TRAINING SYSTEM BASIS ANALYSIS REPORT (TSBAR)
Preparing Activity: 11 (AFLCMC/WNE)
Project Number: SESS-2016-049
Use/Relationship:
The TSBAR documents existing training programs and establishes the
functional baseline for the design, development and operation of an integrated Training System
(TS). The TSBAR is used to define training capabilities and establish system requirements for
the TS.
a. This Data Item Description (DID) contains the format, content, and intended use information
for the data deliverable resulting from the work task described in the solicitation.
b. This DID is applicable to all TS acquisition programs.
c. This DID interrelates with DI-PSSS-81635, Mission/Task Analysis Report (MTAR); DI-
PSSS-82101, Training Requirements Analysis Report (TRAR); and DI-PSSS-80569,
Objectives and Media Analysis Report (OMAR).
(Copies of these documents are available online at http://quicksearch.dla.mil.)
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their
approval dates and dates of any applicable amendments, notices, and revisions, shall be as
specified in the contract.
2. Format. Contractor format is acceptable.
3. Content. The content for the TSBAR is shown in 3.1 through 3.7
description of the material to be contained in each section.
3.1 Introduction. This section contains an overview of the purpose and expected application
of the data and the results compiled from this analysis. It shall describe how information
examined and assessments made during this analysis can be integrated with other Instructional
System Development (ISD), Systems Engineering (SE), and Logistics Support Analysis (LSA),
functions to establish the TS as an operational system. It shall describe how training
capabilities and system requirements identified from this analysis will influence the eventual
design, development and operation of the TS.
3.2
Planning and scheduling considerations. This section describes the planning and
scheduling considerations needed to accomplish this analysis and implement the results. It
shall also address these same considerations for any future analysis efforts that are required
to establish the TS. It shall describe the planning/scheduling considerations re
establish a comprehensive set of system level and lower level specifications for the design and
development of the TS.