DI PSSS 82102 数据项说明(DID)培训系统基础分析报告(TSBAR)(2017年2月15日)

ID:44639

大小:0.24 MB

页数:6页

时间:2023-03-17

金币:20

上传者:战必胜
DATA ITEM DESCRIPTION
Title: TRAINING SYSTEM BASIS ANALYSIS REPORT (TSBAR)
Number: DI-PSSS-82102
Approved Date: 20170215
AMSC Number: F9770
Limitation: N/A
DTIC Applicable: No
GIDEP Applicable: No
Preparing Activity: 11 (AFLCMC/WNE)
Project Number: SESS-2016-049
Applicable Forms: N/A
Use/Relationship:
The TSBAR documents existing training programs and establishes the
functional baseline for the design, development and operation of an integrated Training System
(TS). The TSBAR is used to define training capabilities and establish system requirements for
the TS.
a. This Data Item Description (DID) contains the format, content, and intended use information
for the data deliverable resulting from the work task described in the solicitation.
b. This DID is applicable to all TS acquisition programs.
c. This DID interrelates with DI-PSSS-81635, Mission/Task Analysis Report (MTAR); DI-
PSSS-82101, Training Requirements Analysis Report (TRAR); and DI-PSSS-80569,
Objectives and Media Analysis Report (OMAR).
(Copies of these documents are available online at http://quicksearch.dla.mil.)
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their
approval dates and dates of any applicable amendments, notices, and revisions, shall be as
specified in the contract.
2. Format. Contractor format is acceptable.
3. Content. The content for the TSBAR is shown in 3.1 through 3.7
below, along with a
description of the material to be contained in each section.
3.1 Introduction. This section contains an overview of the purpose and expected application
of the data and the results compiled from this analysis. It shall describe how information
examined and assessments made during this analysis can be integrated with other Instructional
System Development (ISD), Systems Engineering (SE), and Logistics Support Analysis (LSA),
functions to establish the TS as an operational system. It shall describe how training
capabilities and system requirements identified from this analysis will influence the eventual
design, development and operation of the TS.
3.2
Planning and scheduling considerations. This section describes the planning and
scheduling considerations needed to accomplish this analysis and implement the results. It
shall also address these same considerations for any future analysis efforts that are required
to establish the TS. It shall describe the planning/scheduling considerations re
quired to
establish a comprehensive set of system level and lower level specifications for the design and
development of the TS.
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭