DATA ITEM DESCRIPTION
Title: Reliability-Centered Maintenance (RCM) Analysis Information Phase Report
Number: DI-PSSS-82115 Approval Date: 20170327
AMSC Number: N9788 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: MC Project Number: PSSS-2017-013
Applicable Forms: RCM analysis information worksheet (Figure 1)
Use/Relationship:
The RCM Analysis Information Phase Report records the detailed information generated by an
RCM Review Group supporting the Marine Corps Systems Command (MCSC) RCM analysis of
a system or asset and supports the performance of the first four steps of the RCM process.
This Data Item Description (DID) provides guidance pertaining to the format, content, and
intended purpose for the information generated from the work task described in the contract
SOW.
This DID is related to DI-PSSS-82116, RCM Analysis Decision Phase Report and
DI-PSSS-82114, RCM Analysis Report.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their
approval dates and dates of any applicable amendments, notices, and revisions, shall be as
specified in the contract.
2. Format. This report shall be in the format reflected in Figure 1 of this DID, and shall be
delivered in the electronic format specified in the contract.
Downloaded from http://www.everyspec.com